亚博体育官网首页

 BHEL floats O&M tender for 1.1 MW rooftop solar project
POWER & RENEWABLE ENERGY

BHEL floats O&M tender for 1.1 MW rooftop solar project

Bharat Heavy Electricals Limited (BHEL) has floated an operation and maintenance (O&M) tender for setting up a 1.1 MW rooftop solar power project in UP and Jharkhand.

From 1.1 MW, 630 kW of rooftop solar power is located in Kanpur, 75 kW in Meerut and 400 kW in Ranchi.

The deadline to submit the bids is 22nd November 2021, and the bids will be opened on the same date.

The bidders will have to submit Rs 200,000 as an earnest money deposit. The winning bidder will have to deposit 5% of the contract value as a security deposit.

For participating in the bidding process, the bidder should prequalify in the criteria provided by the notice inviting tender (NIT).

The winning bidder will be responsible for O&M operations and maintaining the solar system. The bidder will have to inspect 600 kW and 30 kW rooftop solar systems quarterly in Kanpur till 28 September 2023 and 14 June 2024, respectively. The bidder will also have to arrange a half-yearly inspection for a 400 kW rooftop solar system in Ranchi and 75 kW in Meerut till 17 November 2022 and 21 March 2022.

The solar project will include wear and tear, overhauling, machine breakdown and smooth operations.

The successful bidder will have to look after the O&M requirements of the rooftop solar systems. The bidder will have to calibrate the testing equipment annually from the National Accreditation Board for Testing and Calibration Laboratories (NABL) accredited laboratories.


Also read: DMRC floats tenders to install 2 MW rooftop solar PV systems

Bharat Heavy Electricals Limited (BHEL) has floated an operation and maintenance (O&M) tender for setting up a 1.1 MW rooftop solar power project in UP and Jharkhand. From 1.1 MW, 630 kW of rooftop solar power is located in Kanpur, 75 kW in Meerut and 400 kW in Ranchi. The deadline to submit the bids is 22nd November 2021, and the bids will be opened on the same date. The bidders will have to submit Rs 200,000 as an earnest money deposit. The winning bidder will have to deposit 5% of the contract value as a security deposit. For participating in the bidding process, the bidder should prequalify in the criteria provided by the notice inviting tender (NIT). The winning bidder will be responsible for O&M operations and maintaining the solar system. The bidder will have to inspect 600 kW and 30 kW rooftop solar systems quarterly in Kanpur till 28 September 2023 and 14 June 2024, respectively. The bidder will also have to arrange a half-yearly inspection for a 400 kW rooftop solar system in Ranchi and 75 kW in Meerut till 17 November 2022 and 21 March 2022. The solar project will include wear and tear, overhauling, machine breakdown and smooth operations. The successful bidder will have to look after the O&M requirements of the rooftop solar systems. The bidder will have to calibrate the testing equipment annually from the National Accreditation Board for Testing and Calibration Laboratories (NABL) accredited laboratories. Image Source Also read: DMRC floats tenders to install 2 MW rooftop solar PV systems

Next Story
Infrastructure Urban

ClickPost Launches Atlas to Benchmark E-commerce Logistics

ClickPost, a leading logistics intelligence platform, has launched Atlas, a subscription-based benchmarking tool designed to transform how e-commerce brands strategise logistics. Powered by ClickPost鈥檚 proprietary network, which processes over 50 million shipments each month, Atlas enables brands to benchmark key operational metrics in real time against industry peers and standards.Unlike traditional dashboards, Atlas delivers comparative insights鈥攆rom fulfilment speeds, RTO rates and average order values to city-level delivery times and sales data鈥攁llowing brands to identify operational..

Next Story
Real Estate

Kalyani Launches Two New LivingTree Towers in Bengaluru

Bengaluru-based Kalyani Developers has announced the launch of Towers 3 and 4 at its flagship residential project, Kalyani LivingTree, located in KIADB Aerospace Park. The expansion adds 525 premium 3BHK apartments, ranging from 1300 to 1600 sq ft, and over 7.5 lakh sq ft of built-up area. Prices start from Rs 1.2 crore.These towers, the most exclusive in Phase 1, offer uninterrupted pool and landscape views, and access to over 60 lifestyle amenities, two clubhouses totalling 1 lakh sq ft, and more than 80 per cent open space.LivingTree spans 25 acres and will comprise ten towers of 23鈥�24 fl..

Next Story
Infrastructure Urban

Blue Water Logistics IPO opens May 27

Hyderabad-based Blue Water Logistics is launching its Rs 40.5 crore IPO on May 27, 2025, which will remain open for subscription until May 29. The price band has been set at Rs 132 to Rs 135 per share, with a lot size of 1,000 shares. This is a book-built issue entirely comprising a fresh issue of 30 lakh equity shares. The IPO will be listed on the NSE Emerge platform.Smart Horizon Capital Advisors is the sole book-running lead manager, while Maashitla Securities will act as the registrar. The anchor book will open on May 26, 2025. The IPO allocates 8,35,000 shares to anchor investors, 1,56,0..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement