亚博体育官网首页

GUVNL announces winners of 750 MW Solar Auction
POWER & RENEWABLE ENERGY

GUVNL announces winners of 750 MW Solar Auction

Solarcraft Power India 2 (Blupine Energy), Solairdirect Energy (Engie), Tata Power Renewable Energy, and Utkrrisht Solar Energy (UPC Renewables) were the auction winners for 750 MW of power from Gujarat Urja Vikas Nigam (GUVNL).

Engie won 200 MW at Rs 2.50 kWh, while Blupine won 120 MW at Rs 2.49 kWh. Tata Power won 300 MW at Rs 2.65 per kWh. UPC Renewables won 130 MW of the 280 MW quoted capacity at Rs. 2.66 kWh.

The discovered tariff of Rs 2.49 kWh is 8% higher than the discovered bid of Rs 2.30 kWh in GUVNL's auction to develop 500 MW of solar projects with a greenshoe option of up to 500 MW. The winners were Aditya Birla, Hinduja Renewables Energy, and SJVN. In GUVNL's solar auction, the lowest price ever discovered was Rs 1.99 kWh in December 2020 for 500 MW of solar projects. NTPC, Torrent Power, Al Jomaih Energy and Water Company, and Aditya Renwables all quoted this tariff.

GUVNL intends to purchase solar power to meet its renewable power purchase obligation (RPPO) and distribution company requirements.

The tender was publicised in July of this year.

The tender stated that only commercially established and operational technologies could be used to reduce technology risk and ensure project completion on time. Construction projects that did not have a PPA with an existing buyer were also eligible to participate in the tender.

Solar projects will be permitted in existing wind farms that are already connected to the grid, provided that spare capacity for renewable energy integration is available at the corresponding Gujarat Energy Transmission Corporation substation.

The project's minimum capacity should be 25 MW.

The project should be designed to provide energy on the GETCO outskirts. The project's grid interconnection with the state transmission utility or central transmission utility substation can be accomplished directly via a dedicated line or a pooling substation of an existing wind farm.

GUVNL has issued tenders for.15 GW of solar projects, according to Mercom's India Solar Tender Tracker.

See also:
Gujarat entity tenders for 1.5 GW of solar power procurement.
Bids Invited for 41 MW of solar projects at GETCO substations 


Solarcraft Power India 2 (Blupine Energy), Solairdirect Energy (Engie), Tata Power Renewable Energy, and Utkrrisht Solar Energy (UPC Renewables) were the auction winners for 750 MW of power from Gujarat Urja Vikas Nigam (GUVNL). Engie won 200 MW at Rs 2.50 kWh, while Blupine won 120 MW at Rs 2.49 kWh. Tata Power won 300 MW at Rs 2.65 per kWh. UPC Renewables won 130 MW of the 280 MW quoted capacity at Rs. 2.66 kWh. The discovered tariff of Rs 2.49 kWh is 8% higher than the discovered bid of Rs 2.30 kWh in GUVNL's auction to develop 500 MW of solar projects with a greenshoe option of up to 500 MW. The winners were Aditya Birla, Hinduja Renewables Energy, and SJVN. In GUVNL's solar auction, the lowest price ever discovered was Rs 1.99 kWh in December 2020 for 500 MW of solar projects. NTPC, Torrent Power, Al Jomaih Energy and Water Company, and Aditya Renwables all quoted this tariff. GUVNL intends to purchase solar power to meet its renewable power purchase obligation (RPPO) and distribution company requirements. The tender was publicised in July of this year. The tender stated that only commercially established and operational technologies could be used to reduce technology risk and ensure project completion on time. Construction projects that did not have a PPA with an existing buyer were also eligible to participate in the tender. Solar projects will be permitted in existing wind farms that are already connected to the grid, provided that spare capacity for renewable energy integration is available at the corresponding Gujarat Energy Transmission Corporation substation. The project's minimum capacity should be 25 MW. The project should be designed to provide energy on the GETCO outskirts. The project's grid interconnection with the state transmission utility or central transmission utility substation can be accomplished directly via a dedicated line or a pooling substation of an existing wind farm. GUVNL has issued tenders for.15 GW of solar projects, according to Mercom's India Solar Tender Tracker. See also: Gujarat entity tenders for 1.5 GW of solar power procurement.Bids Invited for 41 MW of solar projects at GETCO substations 

Next Story
Infrastructure Urban

3i Infotech Reports Rs 7.25 Bn Revenue for FY25

3i Infotech, a leading provider of digital transformation, technology services and technology solutions, announced its consolidated financial results for the fourth quarter and full year FY25, ended on March 31st, 2025. The company maintained its growth momentum, displaying consistent progress for the 3rd consecutive quarter.In Q4 FY25, 3i Infotech reported revenue of Rs 1.87 billion, reflecting steady performance compared to Rs 1.81 billion in Q3 FY25 and Rs 1.97 billion in Q4 FY24. The company delivered strong profitability improvements, with gross margin growing by 14.8 per cent Q-o-Q and 1..

Next Story
Infrastructure Urban

Emerald Finance Joins Baya PTE to Boost SME Bill Discounting

Emerald Finance is a dynamic company offering a spectrum of financial products and services including its flagship Earned Wage Access (EWA) in India, has entered into a strategic partnership with Singapore-based Baya PTE through its Indian subsidiary. This collaboration aims to strengthen bill discounting services for Small and Medium Enterprises (SMEs), enabling faster access to working capital and improved cash flow management.The initiative is designed to support SMEs that supply to large corporates such as JSW Steel, Delhivery, and PVR INOX, among others. By facilitating timely invoice dis..

Next Story
Infrastructure Urban

BLS E-Services Crosses Rs 5 Bn Revenue Mark in FY25

BLS E-Services, a technology-enabled digital service provider, announced its audited consolidated financial results for the quarter and full year period ended 31 March 2025.Speaking about the performance and recent updates, Shikhar Aggarwal, Chairman, BLS E- Services said, 鈥淲e are delighted to report a remarkable performance in FY25, as we achieved several milestones during the fiscal year. FY25 marked our highest-ever financial performance, as we surpassed Rs 5 billion milestone in Total Income during the year, which was reported at Rs 5.45 billion, a notable YoY growth of 76 per cent. The ..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement