亚博体育官网首页

Northern Railway Issues Tenders for 2.79 MW Solar Projects
POWER & RENEWABLE ENERGY

Northern Railway Issues Tenders for 2.79 MW Solar Projects

The Northern Railway, Moradabad division, has announced two tenders for solar projects with a total capacity of 2.791 MW. These installations will be set up across residential and service buildings, as well as level crossing gates. The deadline for bid submission is February 27, 2025, with bid openings scheduled for the same day.

Both projects require the design, supply, testing, and commissioning of solar systems. The installations will use monocrystalline passivated emitter and rear cell (Mono PERC) half-cut type modules, string inverters with maximum power point tracking and remote data logging, and aluminum mounting structures.

The first tender, with a capacity of 1.229 MW, is designated for residential buildings within the division. It requires an earnest money deposit of Rs 481,000 and a performance guarantee amounting to 3 per cent of the contract value. The estimated project cost is Rs 662.9 million.

The second tender, with a capacity of 1.562 MW, includes a 1.527 MW installation at service buildings and a 35 kW system for level crossing gates. This tender mandates an earnest money deposit of Rs 564,000 and a performance bank guarantee of 3 per cent of the contract value. The estimated cost is Rs 829.8 million.

Both projects must be commissioned within six months of the contract award and include ten years of comprehensive maintenance services after a one-year warranty. Joint ventures and consortiums are not permitted to bid.

Eligible bidders must meet experience criteria based on similar completed projects over the past seven years and maintain an average annual contractual turnover equal to or exceeding the advertised project value. Non-compliance with project requirements may result in penalties or debarment.

Separately, the Railway Energy Management Company has invited bids for 500 MW of renewable energy supply to the Indian Railways.

News source: Mercom India

The Northern Railway, Moradabad division, has announced two tenders for solar projects with a total capacity of 2.791 MW. These installations will be set up across residential and service buildings, as well as level crossing gates. The deadline for bid submission is February 27, 2025, with bid openings scheduled for the same day. Both projects require the design, supply, testing, and commissioning of solar systems. The installations will use monocrystalline passivated emitter and rear cell (Mono PERC) half-cut type modules, string inverters with maximum power point tracking and remote data logging, and aluminum mounting structures. The first tender, with a capacity of 1.229 MW, is designated for residential buildings within the division. It requires an earnest money deposit of Rs 481,000 and a performance guarantee amounting to 3 per cent of the contract value. The estimated project cost is Rs 662.9 million. The second tender, with a capacity of 1.562 MW, includes a 1.527 MW installation at service buildings and a 35 kW system for level crossing gates. This tender mandates an earnest money deposit of Rs 564,000 and a performance bank guarantee of 3 per cent of the contract value. The estimated cost is Rs 829.8 million. Both projects must be commissioned within six months of the contract award and include ten years of comprehensive maintenance services after a one-year warranty. Joint ventures and consortiums are not permitted to bid. Eligible bidders must meet experience criteria based on similar completed projects over the past seven years and maintain an average annual contractual turnover equal to or exceeding the advertised project value. Non-compliance with project requirements may result in penalties or debarment. Separately, the Railway Energy Management Company has invited bids for 500 MW of renewable energy supply to the Indian Railways. News source: Mercom India

Next Story
Infrastructure Transport

Bombay HC Orders MMRDA To Delay Bids for Thane-Ghodbunder Tunnel

The Bombay High Court directed the Mumbai Metropolitan Region Development Authority (MMRDA) to delay opening financial bids for the Thane-Ghodbunder to Bhayandar tunnel and elevated road project until Thursday. This followed a plea by construction firm Larsen & Toubro (L&T), which claimed it was not informed about the status of its bid while others were.The project, estimated to cost Rs six hundred billion, includes a 9.8 kilometre elevated road over Vasai Creek and is set to be the second longest such structure after the Atal Setu. It is planned as an extension of the Mumbai Coastal R..

Next Story
Infrastructure Energy

India Sets Up First Carbon Capture Testbeds for Cement Industry

India has launched five Carbon Capture and Utilisation (CCU) testbeds in the cement sector, forming the first innovation cluster to combat industrial carbon emissions. The Department of Science and Technology (DST) introduced this initiative to support the country鈥檚 climate goals and reduce emissions from carbon-intensive industries.CCU technology can trap carbon dioxide from cement manufacturing and convert it into valuable products such as synthetic fuels, urea, soda, chemicals, food-grade CO2, and concrete aggregates. This initiative aligns with India鈥檚 National Determined Contributions..

Next Story
Infrastructure Urban

Karnataka Considers One-Time Settlement of Contractor Dues

The Karnataka government is mulling a one-time settlement plan to address pending dues of Rs 320 billion owed by eight departments, including the Bruhat Bengaluru Mahanagara Palike (BBMP), to private contractors across the state.This proposal was discussed in a meeting between Deputy Chief Minister D K Shivakumar and Karnataka State Contractors鈥� Association president R Manjunath in Bengaluru. Manjunath noted that small- and medium-scale contractors were the most affected by the prolonged payment delays, with some waiting for up to two years.The Deputy Chief Minister directed officials to pri..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement