Energy and power department- Government of Sikkim has released a tender for 11 kv downstream connectivity works of mangan, gyalshing and Soreng districts of Sikkim state under revamped reforms-based and results-linked, distribution sector scheme. 

Key Dates

Event

Date & Time 

Deadline for Submission of Bid

20.04.2023 at 1600 Hours (IST)


Date & Time of Opening of Technical Part of Bid

21.04.2023 at 1100 Hours (IST)


Bidding will be conducted through national open competitive e-procurement.  The bidding document is available online  for downloading on https://sikkimtender.gov.in  16.03.2023 to 20.04.2023.

Brief description of scope of work: 

The scope of work under the subject package includes site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material, required to complete the following works in Gangtok, Pakyong, Namchi & Mangan district of Sikkim which inter-alia include :

11 KV Downstream connectivity at Gyalshing, Soreng & Mangan:

i. 11Kv 3 phase, transmission line on DOG conductor.

ii. 11 KV, 120sqmm, XLPE insulated armoured cable with Aluminium conductor from 11KV feeder panel to OH line.

iii. Capacity addition of Distribution Sub- stations of following capacities:

a)63KVA

b)100 KVA

c)200KVA

d)315KVA

iv. Extension of 3 phase, 5 wire L.T.

Distribution line.

v. Conversion of overhead L.T. Distribution

line into Ariel Bunch cable(3x50+1x35+1x16) system.

The tender seeks electrical work worth Rs 26,91,00,000 crore to be completed in 730 days. As per the tender, the bid validity will be 180 days, and it will be an open bidding process. The bid submission period began on April 1, 2023 and will end on May 2, 2023. 

Bid opening place: Conference Hall, Top Floor, Kazi Road, Power Deptt

Essential details:

Project Estimated Value: � 26,91,00,000

Product Category: Electrical Works

Form of Contract: FOI

Bid Validity (Days): 180 

Period of Work: 730 days 

Tender ID - 2023_EPDsi_635_1

Tender Ref. No.:85/RDSS/WORK/POWER/GOS/ACE-II

Payment mode: Offline


Energy and power department- Government of Sikkim has released a tender for 11 kv downstream connectivity works of mangan, gyalshing and Soreng districts of Sikkim state under revamped reforms-based and results-linked, distribution sector scheme. Key DatesEventDate & Time Deadline for Submission of Bid20.04.2023 at 1600 Hours (IST)Date & Time of Opening of Technical Part of Bid21.04.2023 at 1100 Hours (IST)Bidding will be conducted through national open competitive e-procurement.  The bidding document is available online  for downloading on https://sikkimtender.gov.in  16.03.2023 to 20.04.2023.Brief description of scope of work: The scope of work under the subject package includes site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material, required to complete the following works in Gangtok, Pakyong, Namchi & Mangan district of Sikkim which inter-alia include :11 KV Downstream connectivity at Gyalshing, Soreng & Mangan:i. 11Kv 3 phase, transmission line on DOG conductor.ii. 11 KV, 120sqmm, XLPE insulated armoured cable with Aluminium conductor from 11KV feeder panel to OH line.iii. Capacity addition of Distribution Sub- stations of following capacities:a)63KVAb)100 KVAc)200KVAd)315KVAiv. Extension of 3 phase, 5 wire L.T.Distribution line.v. Conversion of overhead L.T. Distributionline into Ariel Bunch cable(3x50+1x35+1x16) system.The tender seeks electrical work worth Rs 26,91,00,000 crore to be completed in 730 days. As per the tender, the bid validity will be 180 days, and it will be an open bidding process. The bid submission period began on April 1, 2023 and will end on May 2, 2023. Bid opening place: Conference Hall, Top Floor, Kazi Road, Power DepttEssential details:Project Estimated Value: � 26,91,00,000 Product Category: Electrical Works Form of Contract: FOIBid Validity (Days): 180 Period of Work: 730 days Tender ID - 2023_EPDsi_635_1Tender Ref. No.:85/RDSS/WORK/POWER/GOS/ACE-IIPayment mode: Offline

Next Story
Infrastructure Transport

Mumbai-Ahmedabad Bullet Train Set to Launch by 2028

India’s first bullet train is set to revolutionize high-speed travel along the western corridor, with the Mumbai-Ahmedabad high-speed rail project aiming for a 2028 launch. This announcement marks a major milestone in India’s infrastructure goals, as it promises to reduce travel time between the two economic hubs from eight hours to just three.Spanning a planned 508-kilometre stretch, the corridor stands as a flagship example of Indo-Japanese collaboration in technology and engineering. Once operational, the train is expected to transform intercity mobility and place India among the select..

Next Story
Infrastructure Transport

Mumbai-Gandhinagar Train Service Enhances Passenger Capacity

The Mumbai Central–Gandhinagar Capital Vande Bharat Express has increased its passenger capacity by adding four additional AC chair car coaches to meet the growing commuter demand on one of India’s busiest business corridors. This upgrade, effective from 11 May, raised the train’s seating capacity from 1,128 to 1,440 passengers, allowing it to serve 936 more passengers daily in both directions. The increase was described as a practical measure to accommodate the surging demand on the busy Mumbai–Ahmedabad–Gandhinagar route, which regularly operates at over 150 percent seat occupancy...

Next Story
Infrastructure Urban

Delhi Plans 12 Sewage Plants to Clean Najafgarh Drain Efficiently

Delhi’s ambitious plan to improve the water quality of the Yamuna River has gained significant momentum as the Delhi Jal Board (DJB) has begun work on 12 new sewage treatment plants (STPs) aimed at reducing the volume of untreated sewage being discharged from the Najafgarh Drain.This initiative forms part of the ongoing efforts to clean the Yamuna and restore the river’s health, which has long been a critical environmental issue for the national capital. Given the alarming pollution levels in the Yamuna, experts and officials consider this project a vital step toward addressing the persist..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement