亚博体育官网首页

Surplus solar power by Gujarat discoms to be compensated at Rs 2.25/kWh
POWER & RENEWABLE ENERGY

Surplus solar power by Gujarat discoms to be compensated at Rs 2.25/kWh

The Gujarat Electricity Regulatory Commission (GERC) allowed a petition seeking amendments in the tariff framework to procure solar power by distributing companies (discoms) and others. It passed out orders regarding the surplus solar power by micro, small, and medium enterprises (MSMEs).

Gujarat Urja Vikas Nigam (GUVNL) filed the petition, requesting amendments in the GERC Regulations, 2016.

GERCs, in their industrial policy in August 2020, announced that the solar project set up by the MSMEs with more than 50% of its contracted demand has increased its power consumption cycle from a 15-minute time block to 7 am to 6 am. The consumer will get time from 7 am to 6 pm to consume the solar energy, and the rest is banked. Earlier, in the 15-minute block energy, the energy which remains unconsumed had to be banked.

discoms will purchase any surplus solar energy unconsumed by the consumers, as per the energy accounting at Rs 2.25 per kWh instead of Rs 1.75 per kWh.

The GERC approved a switchover option for MSME projects approved before September 2019 to the mechanism mentioned in September 2020.

Gujarat has been making many amendments to encourage MSMEs solar project. In the year 2019, the government allowed MSME to install solar projects which are more than 100% of their contract demand. Later it allowed third-party open-access power by MSMEs by paying 100% of the cross-subsidy surcharge and additional surcharge to open access consumers.


Also read: BHEL floats tenders for 8 MW solar station project in Mauritius

Also read: Hybrid, solar and wind energy projects of 9 GW to be set up soon

The Gujarat Electricity Regulatory Commission (GERC) allowed a petition seeking amendments in the tariff framework to procure solar power by distributing companies (discoms) and others. It passed out orders regarding the surplus solar power by micro, small, and medium enterprises (MSMEs). Gujarat Urja Vikas Nigam (GUVNL) filed the petition, requesting amendments in the GERC Regulations, 2016. GERCs, in their industrial policy in August 2020, announced that the solar project set up by the MSMEs with more than 50% of its contracted demand has increased its power consumption cycle from a 15-minute time block to 7 am to 6 am. The consumer will get time from 7 am to 6 pm to consume the solar energy, and the rest is banked. Earlier, in the 15-minute block energy, the energy which remains unconsumed had to be banked. discoms will purchase any surplus solar energy unconsumed by the consumers, as per the energy accounting at Rs 2.25 per kWh instead of Rs 1.75 per kWh. The GERC approved a switchover option for MSME projects approved before September 2019 to the mechanism mentioned in September 2020. Gujarat has been making many amendments to encourage MSMEs solar project. In the year 2019, the government allowed MSME to install solar projects which are more than 100% of their contract demand. Later it allowed third-party open-access power by MSMEs by paying 100% of the cross-subsidy surcharge and additional surcharge to open access consumers. Image Source Also read: BHEL floats tenders for 8 MW solar station project in Mauritius Also read: Hybrid, solar and wind energy projects of 9 GW to be set up soon

Next Story
Infrastructure Urban

3i Infotech Reports Rs 7.25 Bn Revenue for FY25

3i Infotech, a leading provider of digital transformation, technology services and technology solutions, announced its consolidated financial results for the fourth quarter and full year FY25, ended on March 31st, 2025. The company maintained its growth momentum, displaying consistent progress for the 3rd consecutive quarter.In Q4 FY25, 3i Infotech reported revenue of Rs 1.87 billion, reflecting steady performance compared to Rs 1.81 billion in Q3 FY25 and Rs 1.97 billion in Q4 FY24. The company delivered strong profitability improvements, with gross margin growing by 14.8 per cent Q-o-Q and 1..

Next Story
Infrastructure Urban

Emerald Finance Joins Baya PTE to Boost SME Bill Discounting

Emerald Finance is a dynamic company offering a spectrum of financial products and services including its flagship Earned Wage Access (EWA) in India, has entered into a strategic partnership with Singapore-based Baya PTE through its Indian subsidiary. This collaboration aims to strengthen bill discounting services for Small and Medium Enterprises (SMEs), enabling faster access to working capital and improved cash flow management.The initiative is designed to support SMEs that supply to large corporates such as JSW Steel, Delhivery, and PVR INOX, among others. By facilitating timely invoice dis..

Next Story
Infrastructure Urban

BLS E-Services Crosses Rs 5 Bn Revenue Mark in FY25

BLS E-Services, a technology-enabled digital service provider, announced its audited consolidated financial results for the quarter and full year period ended 31 March 2025.Speaking about the performance and recent updates, Shikhar Aggarwal, Chairman, BLS E- Services said, 鈥淲e are delighted to report a remarkable performance in FY25, as we achieved several milestones during the fiscal year. FY25 marked our highest-ever financial performance, as we surpassed Rs 5 billion milestone in Total Income during the year, which was reported at Rs 5.45 billion, a notable YoY growth of 76 per cent. The ..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement