亚博体育官网首页

TANCEM invites bids for 20 MW solar projects at Alangulam Cement Works
POWER & RENEWABLE ENERGY

TANCEM invites bids for 20 MW solar projects at Alangulam Cement Works

Tamil Nadu Cements Corporation (TANCEM) is seeking proposals from consultants for the preparation of a detailed project report (DPR) for the implementation of a 20 MW solar power project at Alangulam Cement Works in Virudhnagar district.

The deadline for bid submission is February 19, 2024, with the bid opening scheduled for the same day. Interested parties are required to provide an earnest money deposit of Rs 10,000 (~$120).

TANCEM aims to fulfill the energy requirements of its Alangulam cement plant, boasting an annual production capacity of 200,000 tons of cement, through the proposed solar project.

The chosen consultant will be responsible for developing the DPR within 30 days of receiving the work order. The scope of work encompasses a techno-economic feasibility study, evaluating the suitability of the land site, technical aspects of the solar project's proposed locations, and assessments of land, utilities, and technology. Additionally, the consultant will analyse the financial viability of the project.

Eligibility criteria for tender submission include operational status for a minimum of three years among Indian firms. Qualified bidders must demonstrate an average turnover of Rs 3 million ($36,144) in the past three financial years and possess experience in managing ground-mounted solar projects exceeding 20 MW capacity. This experience should involve either a single project valued at Rs 4 million ($48,192) or two similar projects, each with a minimum value of Rs 2.5 million ($30,120).

Participation in the tender is restricted to bidders with a positive growth in net worth over the last three years.

Last July, the Cement Corporation of India issued an invitation for bids to install and commission 1 MW of grid-connected solar projects at its Bokajan factory in Assam.

Tamil Nadu Cements Corporation (TANCEM) is seeking proposals from consultants for the preparation of a detailed project report (DPR) for the implementation of a 20 MW solar power project at Alangulam Cement Works in Virudhnagar district. The deadline for bid submission is February 19, 2024, with the bid opening scheduled for the same day. Interested parties are required to provide an earnest money deposit of Rs 10,000 (~$120). TANCEM aims to fulfill the energy requirements of its Alangulam cement plant, boasting an annual production capacity of 200,000 tons of cement, through the proposed solar project. The chosen consultant will be responsible for developing the DPR within 30 days of receiving the work order. The scope of work encompasses a techno-economic feasibility study, evaluating the suitability of the land site, technical aspects of the solar project's proposed locations, and assessments of land, utilities, and technology. Additionally, the consultant will analyse the financial viability of the project. Eligibility criteria for tender submission include operational status for a minimum of three years among Indian firms. Qualified bidders must demonstrate an average turnover of Rs 3 million ($36,144) in the past three financial years and possess experience in managing ground-mounted solar projects exceeding 20 MW capacity. This experience should involve either a single project valued at Rs 4 million ($48,192) or two similar projects, each with a minimum value of Rs 2.5 million ($30,120). Participation in the tender is restricted to bidders with a positive growth in net worth over the last three years. Last July, the Cement Corporation of India issued an invitation for bids to install and commission 1 MW of grid-connected solar projects at its Bokajan factory in Assam.

Next Story
Infrastructure Energy

Govt, Automakers Discuss Raising Ethanol Blend Beyond 20%

The Indian government has begun talks with automobile original equipment manufacturers (OEMs) to increase ethanol blending in petrol beyond twenty per cent, with the current E20 target set for October 2025.Major OEMs such as Tata Motors, Mahindra and Mahindra, and Maruti Suzuki have raised concerns about high investment requirements and limited consumer interest. A draft report is being prepared by officials from the petroleum, transport, and agriculture ministries for cabinet review.Industry executives said upgrading vehicles from E20 to higher blends like E40 or E45 could raise costs by two ..

Next Story
Infrastructure Urban

Hyundai India to Launch Hybrid, Plans 26 Models by 2030

Hyundai Motor India Limited will introduce a hybrid vehicle as part of a larger plan to launch twenty-six models by 2030. The move aligns Hyundai with Toyota and Suzuki, who advocate hybrids to address India鈥檚 limited charging network and price-sensitive market.The refreshed portfolio will include six battery-electric vehicles, twenty internal combustion engine models, and one hybrid. These will span both mass and premium segments, including hybrid sport utility vehicles.According to Chief Operating Officer Tarun Garg, no single technology can meet all market needs. He called the hybrid segm..

Next Story
Infrastructure Transport

Railway Board Approves Survey for 4th Terminal Near Bengaluru

The Railway Board has approved a Final Location Survey for a mega coaching terminal near Bengaluru airport. The proposed terminal, to be located near Devanahalli or along the Yelahanka鈥揇evanahalli鈥揅hikkaballapur route, is estimated to cost Rs 13.5 million.According to South Western Railway, the new terminal will decongest Bengaluru鈥檚 overburdened railway infrastructure and meet growing passenger demand. It will serve as the fourth terminal, offering operational flexibility and capacity to handle thirty-six rakes daily.The design includes twelve pit lines, five washing lines, twenty-four ..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement