亚博体育官网首页

UPNEDA Calls for Bids on 3.205 GW Solar Projects under PM KUSUM
POWER & RENEWABLE ENERGY

UPNEDA Calls for Bids on 3.205 GW Solar Projects under PM KUSUM

The Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) has issued a tender for 3.205 MW of grid-connected solar power projects as part of the feeder-level solarisation initiative under the PM KUSUM component C2 program.

The deadline for bid submissions is August 27, 2024, with the bids being opened the following day.

Bidders are required to pay Rs 1,180 as a document fee and Rs 2,950 per MW.

An earnest money deposit (EMD) of Rs 100,000 per MW is also required. Bidders can submit proposals for any number of substations or projects without any cap on the total bid capacity.

Bidders must provide a performance bank guarantee of Rs 100,000 per MW, which will be returned after the power purchase agreement (PPA) tenure, subject to any applicable penalties.

Bidders are required to have an average annual turnover of Rs 20 million per MW of the capacity quoted over the last five financial years. Additionally, the net worth of the bidder or the lead member of a consortium must be positive for the previous three financial years.

Only one bid per substation or project is allowed, and all feeders from one substation are considered a single project.

The substations selected for feeder-level solarisation must include at least one dedicated agricultural feeder from a 33/11 kV substation capable of accommodating the proposed solar project.

The Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) has issued a tender for 3.205 MW of grid-connected solar power projects as part of the feeder-level solarisation initiative under the PM KUSUM component C2 program. The deadline for bid submissions is August 27, 2024, with the bids being opened the following day. Bidders are required to pay Rs 1,180 as a document fee and Rs 2,950 per MW. An earnest money deposit (EMD) of Rs 100,000 per MW is also required. Bidders can submit proposals for any number of substations or projects without any cap on the total bid capacity. Bidders must provide a performance bank guarantee of Rs 100,000 per MW, which will be returned after the power purchase agreement (PPA) tenure, subject to any applicable penalties. Bidders are required to have an average annual turnover of Rs 20 million per MW of the capacity quoted over the last five financial years. Additionally, the net worth of the bidder or the lead member of a consortium must be positive for the previous three financial years. Only one bid per substation or project is allowed, and all feeders from one substation are considered a single project. The substations selected for feeder-level solarisation must include at least one dedicated agricultural feeder from a 33/11 kV substation capable of accommodating the proposed solar project.

Next Story
Products

unWOOD transforms plastic waste into durable wood alternative

unWOOD, a breakthrough innovation, is converting hard-to-recycle plastic waste into a durable alternative to natural wood. Developed through a proprietary process called Intelligent Compounding, unWOOD uses a Macro Molecular Fiber Matrix (MMFM) structure to replicate the strength, look, and feel of hardwood鈥攚ithout the environmental cost.Conceptualised by Dr Babu Padmanabhan, the material addresses key flaws in traditional plastic recycling by consuming minimal energy, using zero water, and generating no microplastics. 鈥淎ny application that introduces plastics into areas where it cannot be..

Next Story
Real Estate

H盲fele launches Matrix undermount runners range

H盲fele has introduced its new Matrix range of undermount runners, designed to enhance drawer motion across kitchens, wardrobes, bathroom units, and more.Available in four weight capacities and a wide range of lengths, the Matrix undermount runners support diverse drawer designs. The 40 kg and 60 kg variants feature synchronised technology for superior motion and drawer stability. All runners come with an integrated soft-close mechanism to ensure smooth and noiseless operation.This in-house range is ideal for kitchen cabinets, bed storage units, living room furniture and bathroom drawers, offe..

Next Story
Real Estate

India's first AI-integrated campus announced in Noida

Yashoda Hospital and Bhutani Infra have announced plans to develop India鈥檚 first fully AI-integrated mixed-use campus in Greater Noida West. The upcoming project will feature a hospital, retail spaces, offices, SOHOs, serviced apartments, and a hotel鈥攁ll operating within a self-learning, generative AI-powered ecosystem.The AI-first campus will integrate real-time data systems, predictive analytics, and adaptive infrastructure to offer personalised experiences across functions. From AI-enabled footfall tracking and dynamic energy optimisation to smart F&B and retail insights, the develo..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement