亚博体育官网首页

Srinagar-Leh NH  lacks basic trauma care facilities
ROADS & HIGHWAYS

Srinagar-Leh NH lacks basic trauma care facilities

Srinagar-Leh National Highway, the lone road link connecting Kashmir with Ladakh through Zojila Pass, lacks adequate basic trauma care facilities, reducing the chances of survival in case of accidents along the lengthy highway. Every year, scores of deaths are caused due to accidents which could be ...

Srinagar-Leh National Highway, the lone road link connecting Kashmir with Ladakh through Zojila Pass, lacks adequate basic trauma care facilities, reducing the chances of survival in case of accidents along the lengthy highway. Every year, scores of deaths are caused due to accidents which could be significantly brought down with a robust trauma system, which is not up to the mark. On the highway from both the Kashmir and Ladakh sides, there are hardly any trauma care facilities. Accidents near Zojila Pass and beyond compel people to transport trauma victims directly to Srinagar, requiring a journey of over 110 km. Although the health department鈥檚 designated trauma centre had an operation theatre installed 10 years ago, it is still not functional.

Next Story
Real Estate

RERA Orders Builder to Refund Buyers for Project Delay in Telangana

The Telangana Real Estate Regulatory Authority (TGRERA) has ordered R 亚博体育官网首页s Realtors Global LLP to refund six buyers for delays in completing a residential project at Beeramguda. The buyers had booked flats in Jai Vasavi鈥檚 ORR Heights in 2021, paying over Rs eight million.The builder promised construction would start by January 2022 and flats would be handed over within thirty months of approvals. However, even after more than two years, only initial digging work was done. The builder changed building plans from five floors to nine without informing buyers or obtaining consent.RERA found tha..

Next Story
Infrastructure Transport

Bombay HC Orders MMRDA To Delay Bids for Thane-Ghodbunder Tunnel

The Bombay High Court directed the Mumbai Metropolitan Region Development Authority (MMRDA) to delay opening financial bids for the Thane-Ghodbunder to Bhayandar tunnel and elevated road project until Thursday. This followed a plea by construction firm Larsen & Toubro (L&T), which claimed it was not informed about the status of its bid while others were.The project, estimated to cost Rs six hundred billion, includes a 9.8 kilometre elevated road over Vasai Creek and is set to be the second longest such structure after the Atal Setu. It is planned as an extension of the Mumbai Coastal R..

Next Story
Infrastructure Energy

India Sets Up First Carbon Capture Testbeds for Cement Industry

India has launched five Carbon Capture and Utilisation (CCU) testbeds in the cement sector, forming the first innovation cluster to combat industrial carbon emissions. The Department of Science and Technology (DST) introduced this initiative to support the country鈥檚 climate goals and reduce emissions from carbon-intensive industries.CCU technology can trap carbon dioxide from cement manufacturing and convert it into valuable products such as synthetic fuels, urea, soda, chemicals, food-grade CO2, and concrete aggregates. This initiative aligns with India鈥檚 National Determined Contributions..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement