The North Eastern Regional (NER) Grid of India, serving a population of more than 30 million, aims to improve reliability of power evacuation, reduce intermittency, and accelerate sustainability of renewables for this region. Hence, The Ministry of Power in India allotted Sterlite Power, developer of power transmission infrastructure projects in India, the NER-II Transmission Limited project to develop transmission lines across the region.
The project was of strategic importance to India’s renewable energy targets. It strengthens interconnection with the states of Assam and Arunachal Pradesh and provides an additional source of power to the latter’s capital, Itanagar.
The project included designing and constructing a 400 kV/132 kV substation in Tripura state to evacuate gas-generated power from ONGC’s Palatana power plant (a 726.3 MW combined-cycle gas turbine). The substation was the only one delivering much-needed power to the state of Tripura.
Challenges
Traditional 2D design methods for substation planning limited the design team’s ability to detect clearance problems between electrical components and support structures. Managing interdependence among activities, design plan inter-linkage, a lack of real-time progress data, and inefficient resource planning, these inefficiencies posed enormous risks in the substation construction timeline adding prolonged inspections, handovers, and resource training difficulties.
Breakthrough
Sterlite Power created design methodologies posed by turning to Bentley’s open utilities substation for 3D modelling and ProjectWise to streamline design and collaboration. This technology change enabled them to detect clearance violations between electrical components and structural supports. The digital libraries provided traceability, accountability, and exportability of models for proper equipment connections.
Adopting BIM 4D technology using SYNCHRO helped Sterlite Power utilise virtual reality to further optimise and refine design and planning. They generated a detailed reality model from images captured with unmanned aerial vehicles, which helped them further optimise substation layout and increase design and planning efficiency.
“With Bentley’s ProjectWise, our project team was able to work in complete collaboration, even when separated by distance. Design being the heart of infrastructure projects, the application’s real-time review system helped us save huge hours of reworking on design errors and enabled us to accelerate the renewable energy journey of India.� said Pratik Agarwal, MD, Sterlite Power.
Outcome
saved nearly Rs 2.3 million and over a month on the project schedule. The cost and time savings can be attributed to a reduction in design closure time through collaboration and a workflow using a connected data environment.
is an infrastructure engineering software company. The article is based on a case study report sent by them.
The North Eastern Regional (NER) Grid of India, serving a population of more than 30 million, aims to improve reliability of power evacuation, reduce intermittency, and accelerate sustainability of renewables for this region. Hence, The Ministry of Power in India allotted Sterlite Power, developer of power transmission infrastructure projects in India, the NER-II Transmission Limited project to develop transmission lines across the region.
The project was of strategic importance to India’s renewable energy targets. It strengthens interconnection with the states of Assam and Arunachal Pradesh and provides an additional source of power to the latter’s capital, Itanagar.
The project included designing and constructing a 400 kV/132 kV substation in Tripura state to evacuate gas-generated power from ONGC’s Palatana power plant (a 726.3 MW combined-cycle gas turbine). The substation was the only one delivering much-needed power to the state of Tripura.
Challenges
Traditional 2D design methods for substation planning limited the design team’s ability to detect clearance problems between electrical components and support structures. Managing interdependence among activities, design plan inter-linkage, a lack of real-time progress data, and inefficient resource planning, these inefficiencies posed enormous risks in the substation construction timeline adding prolonged inspections, handovers, and resource training difficulties.
Breakthrough
Sterlite Power created design methodologies posed by turning to Bentley’s open utilities substation for 3D modelling and ProjectWise to streamline design and collaboration. This technology change enabled them to detect clearance violations between electrical components and structural supports. The digital libraries provided traceability, accountability, and exportability of models for proper equipment connections.
Adopting BIM 4D technology using SYNCHRO helped Sterlite Power utilise virtual reality to further optimise and refine design and planning. They generated a detailed reality model from images captured with unmanned aerial vehicles, which helped them further optimise substation layout and increase design and planning efficiency.
“With Bentley’s ProjectWise, our project team was able to work in complete collaboration, even when separated by distance. Design being the heart of infrastructure projects, the application’s real-time review system helped us save huge hours of reworking on design errors and enabled us to accelerate the renewable energy journey of India.� said Pratik Agarwal, MD, Sterlite Power.
Outcome
Sterlite Power saved nearly Rs 2.3 million and over a month on the project schedule. The cost and time savings can be attributed to a reduction in design closure time through collaboration and a workflow using a connected data environment.
Bentley Systems is an infrastructure engineering software company. The article is based on a case study report sent by them.
Image source
Next Story
3i Infotech Reports Rs 7.25 Bn Revenue for FY25
3i Infotech, a leading provider of digital transformation, technology services and technology solutions, announced its consolidated financial results for the fourth quarter and full year FY25, ended on March 31st, 2025. The company maintained its growth momentum, displaying consistent progress for the 3rd consecutive quarter.In Q4 FY25, 3i Infotech reported revenue of Rs 1.87 billion, reflecting steady performance compared to Rs 1.81 billion in Q3 FY25 and Rs 1.97 billion in Q4 FY24. The company delivered strong profitability improvements, with gross margin growing by 14.8 per cent Q-o-Q and 1..
Next Story
Emerald Finance Joins Baya PTE to Boost SME Bill Discounting
Emerald Finance is a dynamic company offering a spectrum of financial products and services including its flagship Earned Wage Access (EWA) in India, has entered into a strategic partnership with Singapore-based Baya PTE through its Indian subsidiary. This collaboration aims to strengthen bill discounting services for Small and Medium Enterprises (SMEs), enabling faster access to working capital and improved cash flow management.The initiative is designed to support SMEs that supply to large corporates such as JSW Steel, Delhivery, and PVR INOX, among others. By facilitating timely invoice dis..
Next Story
BLS E-Services Crosses Rs 5 Bn Revenue Mark in FY25
BLS E-Services, a technology-enabled digital service provider, announced its audited consolidated financial results for the quarter and full year period ended 31 March 2025.Speaking about the performance and recent updates, Shikhar Aggarwal, Chairman, BLS E- Services said, “We are delighted to report a remarkable performance in FY25, as we achieved several milestones during the fiscal year. FY25 marked our highest-ever financial performance, as we surpassed Rs 5 billion milestone in Total Income during the year, which was reported at Rs 5.45 billion, a notable YoY growth of 76 per cent. The ..