亚博体育官网首页

Search Result

   Back to home
1 - 10 Results of 9

MAHAGENCO and NTPC Win Sinnar Thermal Project Bid

MAHAGENCO and NTPC secure bid for Sinnar thermal project.


Adani Power, NTPC, JSW Energy Compete for Sinnar Thermal Project

Coal supply is a major challenge, and only one unit of 270 MW has achieved commercial operations.


Rs 2.5 bn needed for Nashik-Pune rail land purchase

This demand had been presented by the administration to the Maharail.


Sinnar-Shirdi's 44 km stretch to be operational by March end

The construction of this 44 km segment cost roughly Rs 20 billion.


IL&FS paid compensation of Rs 891cr by NHAI

Termination compensation paid for Khed-Sinnar Expressway


KSB Pumps

Pune-based KSB Pumps (KSB), a subsidiary of KSB AG, Germany (global leader in pump manufacturing), is a pumps and valves manufacturer domestically. The company麓s products are used for pumping, transportation and flow control of fluids, which include clean or contaminated water, explosive fluids, co..


Widening of Nashik-Pune h'way stretch gains speed

On the Nashik-Pune highway, work of widening the Nashik-Sinnar stretch got a respite on December 12 as the Bombay High Court denied extension of the stay order.


IL&FS gets Rs 1,348.20 cr NHAI project in Maha

The National Highways Authority of India's (NHAI) project of four-laning of Khed-Sinnar Section of NH-50 has been bagged by the IL&FS Transportation Networks. The stretch is in Maharashtra. The project work is from Km 42.000 to Km 177.000 (Design Length - 137.946 km) under the Phase IV B in Maharash..


Indiabulls to develop SEZ near Nashik

Indiabulls Group, in association with the Maharashtra Industrial Development Corporation (MIDC), will develop a SEZ near Nashik.


Hi There!

"Now get regular updates from CW Magazine on WhatsApp!

Join the CW WhatsApp channel for the latest news, industry events, expert insights, and project updates from the construction and infrastructure industry.

Click the link below to join"