亚博体育官网首页

Bharatmala project: Extension of Hyderabad's RRR
ROADS & HIGHWAYS

Bharatmala project: Extension of Hyderabad's RRR

The proposed 350 km-long Hyderabad Regional Ring Road (HRRR) project would be undertaken by the Centre as phase 1 of the Bharatmala Pariyojana along the NH-161 Sangareddy-Narsapur-Tupran-Gajwel-Yadagirigutta-Choutuppal section.

According to an announcement made by the Kishan Reddy, Union Minister of Tourism and Culture, the Centre is investing more than Rs 1 lakh crore in ongoing and future national highway projects in Telangana, including Rs 200 billion in the Hyderabad Regional Ring Road project.

Since the BJP-led government at the centre assumed power in 2014, the state's highway building has surpassed the amount built by previous federal governments between 1947 and 2014.

Between 1947 and 2014, the total length of national highways in state was 2,500 km. Between 2014 and 2022, another 2,500 km were built, increasing the length of national highways

In addition, Reddy noted that, prior to the pandemic-related delays, highway construction peaked in 2018鈥�19 at 364.71 km per year, up from a top of around 139.33 km per year in 2014鈥�15.

Also read:
GMR Hyderabad Airport to raise Rs 12.50 bn via NCDs
Hyderabad鈥檚 Megha to construct Mongolia's first greenfield oil refinery


The proposed 350 km-long Hyderabad Regional Ring Road (HRRR) project would be undertaken by the Centre as phase 1 of the Bharatmala Pariyojana along the NH-161 Sangareddy-Narsapur-Tupran-Gajwel-Yadagirigutta-Choutuppal section. According to an announcement made by the Kishan Reddy, Union Minister of Tourism and Culture, the Centre is investing more than Rs 1 lakh crore in ongoing and future national highway projects in Telangana, including Rs 200 billion in the Hyderabad Regional Ring Road project. Since the BJP-led government at the centre assumed power in 2014, the state's highway building has surpassed the amount built by previous federal governments between 1947 and 2014. Between 1947 and 2014, the total length of national highways in state was 2,500 km. Between 2014 and 2022, another 2,500 km were built, increasing the length of national highways In addition, Reddy noted that, prior to the pandemic-related delays, highway construction peaked in 2018鈥�19 at 364.71 km per year, up from a top of around 139.33 km per year in 2014鈥�15. Also read: GMR Hyderabad Airport to raise Rs 12.50 bn via NCDs Hyderabad鈥檚 Megha to construct Mongolia's first greenfield oil refinery

Next Story
Products

unWOOD transforms plastic waste into durable wood alternative

unWOOD, a breakthrough innovation, is converting hard-to-recycle plastic waste into a durable alternative to natural wood. Developed through a proprietary process called Intelligent Compounding, unWOOD uses a Macro Molecular Fiber Matrix (MMFM) structure to replicate the strength, look, and feel of hardwood鈥攚ithout the environmental cost.Conceptualised by Dr Babu Padmanabhan, the material addresses key flaws in traditional plastic recycling by consuming minimal energy, using zero water, and generating no microplastics. 鈥淎ny application that introduces plastics into areas where it cannot be..

Next Story
Real Estate

H盲fele launches Matrix undermount runners range

H盲fele has introduced its new Matrix range of undermount runners, designed to enhance drawer motion across kitchens, wardrobes, bathroom units, and more.Available in four weight capacities and a wide range of lengths, the Matrix undermount runners support diverse drawer designs. The 40 kg and 60 kg variants feature synchronised technology for superior motion and drawer stability. All runners come with an integrated soft-close mechanism to ensure smooth and noiseless operation.This in-house range is ideal for kitchen cabinets, bed storage units, living room furniture and bathroom drawers, offe..

Next Story
Real Estate

India's first AI-integrated campus announced in Noida

Yashoda Hospital and Bhutani Infra have announced plans to develop India鈥檚 first fully AI-integrated mixed-use campus in Greater Noida West. The upcoming project will feature a hospital, retail spaces, offices, SOHOs, serviced apartments, and a hotel鈥攁ll operating within a self-learning, generative AI-powered ecosystem.The AI-first campus will integrate real-time data systems, predictive analytics, and adaptive infrastructure to offer personalised experiences across functions. From AI-enabled footfall tracking and dynamic energy optimisation to smart F&B and retail insights, the develo..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement