Centre to construct first multi-modal railroad corridor in Northeast
23 Jun 2022
2 Min Read
CW Team
The government is planning to construct a strategically important Integrated multi-modal rail and road transport corridor in the Northeast, the first in the country.
Under the project, two road tube tunnels and one rail tube tunnel will be constructed under the Brahmaputra river.
Apart from this, a rail-road infrastructure will be built for the rail-road missing connections, including several new rail lines, a railway station, a loop line, and a station yard. With the help of this mega rail-road transport corridor, logistics ammunition, military vehicles, and armed forces can reach the China border of Tawang, North Assam, and Arunachal Pradesh faster.
Indian Railways, Ministry of Road Transport and Highways (MoRTH), and Ministry of Defence Border Roads' Organisation (BRO) will jointly achieve the project estimated to cost about Rs 7,700 crore.
Last month, The Border Roads Organisation (BRO) gave a project presentation to the Railway Board.
A senior official said there is a proposal to construct two road tube tunnels and one rail tube tunnel, approximately 10 km long, under the Brahmaputra river.
Apart from this, a new railway line of 121.33 km-long will be laid between Rangpara-Tawang. This new rail line will link Tawang, Bhalukpong, Senga, Rupa, and Rangpara. A new railway line will also be laid between Dekragaon-Jamugurihar and Dhalaibil-Jakhlabandh. A new railway station is proposed to be constructed between Dhalaibil-Jamugurihar with an improved number of platforms, a loop line, and station premises.
The official said there are plans to lay an added rail line between South Portal-Silghat. It is not possible to go to the north and south banks of the Brahmaputra river due to the missing connection of the railroad in the Northeast. Because of this, rail-road connectivity will be developed on a priority basis.
A rail-two road tube tunnel will play a strategic part.
For the first time in the nation, infrastructure is being built for strategic objectives so that there will be direct rail-road connectivity from North Assam to Tawang and Arunachal Pradesh鈥檚 China border. Three tunnels will be constructed under the Brahmaputra river for the first time.
Earlier, National Highways and Infrastructure Development Corporation Limited (NHIDCL), an undertaking of the Ministry of Road Transport, had designed a plan to construct a tunnel under the river.
Also read: Indian Railways developing infrastructure facilities at stations
The government is planning to construct a strategically important Integrated multi-modal rail and road transport corridor in the Northeast, the first in the country.
Under the project, two road tube tunnels and one rail tube tunnel will be constructed under the Brahmaputra river.
Apart from this, a rail-road infrastructure will be built for the rail-road missing connections, including several new rail lines, a railway station, a loop line, and a station yard. With the help of this mega rail-road transport corridor, logistics ammunition, military vehicles, and armed forces can reach the China border of Tawang, North Assam, and Arunachal Pradesh faster.
Indian Railways, Ministry of Road Transport and Highways (MoRTH), and Ministry of Defence Border Roads' Organisation (BRO) will jointly achieve the project estimated to cost about Rs 7,700 crore.
Last month, The Border Roads Organisation (BRO) gave a project presentation to the Railway Board.
A senior official said there is a proposal to construct two road tube tunnels and one rail tube tunnel, approximately 10 km long, under the Brahmaputra river.
Apart from this, a new railway line of 121.33 km-long will be laid between Rangpara-Tawang. This new rail line will link Tawang, Bhalukpong, Senga, Rupa, and Rangpara. A new railway line will also be laid between Dekragaon-Jamugurihar and Dhalaibil-Jakhlabandh. A new railway station is proposed to be constructed between Dhalaibil-Jamugurihar with an improved number of platforms, a loop line, and station premises.
The official said there are plans to lay an added rail line between South Portal-Silghat. It is not possible to go to the north and south banks of the Brahmaputra river due to the missing connection of the railroad in the Northeast. Because of this, rail-road connectivity will be developed on a priority basis.
A rail-two road tube tunnel will play a strategic part.
For the first time in the nation, infrastructure is being built for strategic objectives so that there will be direct rail-road connectivity from North Assam to Tawang and Arunachal Pradesh鈥檚 China border. Three tunnels will be constructed under the Brahmaputra river for the first time.
Earlier, National Highways and Infrastructure Development Corporation Limited (NHIDCL), an undertaking of the Ministry of Road Transport, had designed a plan to construct a tunnel under the river.
Image Source
Also read: Indian Railways developing infrastructure facilities at stations
Next Story
3i Infotech Reports Rs 7.25 Bn Revenue for FY25
3i Infotech, a leading provider of digital transformation, technology services and technology solutions, announced its consolidated financial results for the fourth quarter and full year FY25, ended on March 31st, 2025. The company maintained its growth momentum, displaying consistent progress for the 3rd consecutive quarter.In Q4 FY25, 3i Infotech reported revenue of Rs 1.87 billion, reflecting steady performance compared to Rs 1.81 billion in Q3 FY25 and Rs 1.97 billion in Q4 FY24. The company delivered strong profitability improvements, with gross margin growing by 14.8 per cent Q-o-Q and 1..
Next Story
Emerald Finance Joins Baya PTE to Boost SME Bill Discounting
Emerald Finance is a dynamic company offering a spectrum of financial products and services including its flagship Earned Wage Access (EWA) in India, has entered into a strategic partnership with Singapore-based Baya PTE through its Indian subsidiary. This collaboration aims to strengthen bill discounting services for Small and Medium Enterprises (SMEs), enabling faster access to working capital and improved cash flow management.The initiative is designed to support SMEs that supply to large corporates such as JSW Steel, Delhivery, and PVR INOX, among others. By facilitating timely invoice dis..
Next Story
BLS E-Services Crosses Rs 5 Bn Revenue Mark in FY25
BLS E-Services, a technology-enabled digital service provider, announced its audited consolidated financial results for the quarter and full year period ended 31 March 2025.Speaking about the performance and recent updates, Shikhar Aggarwal, Chairman, BLS E- Services said, 鈥淲e are delighted to report a remarkable performance in FY25, as we achieved several milestones during the fiscal year. FY25 marked our highest-ever financial performance, as we surpassed Rs 5 billion milestone in Total Income during the year, which was reported at Rs 5.45 billion, a notable YoY growth of 76 per cent. The ..