Ministry allocates Rs 60 bn for Arunachal Pradesh's highway development
15 Feb 2024
2 Min Read
CW Team
The Ministry of Road Transport and Highways has earmarked an approximate sum of Rs 60 billion for the construction of the strategic Frontier Highway in Arunachal Pradesh, dividing the project into 11 packages. This initiative is a significant step towards enhancing connectivity in border regions. The Frontier Highway, also known as NH-913, is slated to run parallel to the India-Tibet-China-Myanmar border and will be implemented in stages.
This extensive road project, spanning 1748 km as a two-lane highway, will be a collaborative effort involving three government agencies: the State Public Works Department (PWD), the Border Road Organisation (BRO), and the National Highways and Infrastructure Development Corporation (NHIDCL). The highway will be situated approximately 20 km from the international border at various points, with the commencement expected in April 2024.
On February 11, Minister of Road Transport and Highways, Nitin Gadkari, announced the sanction of an estimated Rs 20.98 billion for the construction of Package 2 and 3 (Bomdila-Nafra-Lada section), covering a distance of around 78.3 km. Additionally, he disclosed an estimated sanction of Rs 2.79 billion for Package 7, encompassing the 15.4 km-long Lada-Sarli Section. Both these sections will be executed using the Engineering, Procurement, and Construction (EPC) mode.
Earlier, on February 06, the ministry had allocated an estimated Rs 38.90 billion for the Lada-Sarli section, Sarli-Huri section, and Kharsang-Miao-Vijaynagar-Gandhigram section, collectively spanning 202.14 km.
The Frontier Highway (NH-913) is envisioned to address migration challenges and promote reverse migration to the border areas of Arunachal Pradesh. Furthermore, it will establish connections across vital river basins and support the development of numerous hydropower projects in the state, as highlighted by the Road Transport and Highways Minister.
The Ministry of Road Transport and Highways has earmarked an approximate sum of Rs 60 billion for the construction of the strategic Frontier Highway in Arunachal Pradesh, dividing the project into 11 packages. This initiative is a significant step towards enhancing connectivity in border regions. The Frontier Highway, also known as NH-913, is slated to run parallel to the India-Tibet-China-Myanmar border and will be implemented in stages.
This extensive road project, spanning 1748 km as a two-lane highway, will be a collaborative effort involving three government agencies: the State Public Works Department (PWD), the Border Road Organisation (BRO), and the National Highways and Infrastructure Development Corporation (NHIDCL). The highway will be situated approximately 20 km from the international border at various points, with the commencement expected in April 2024.
On February 11, Minister of Road Transport and Highways, Nitin Gadkari, announced the sanction of an estimated Rs 20.98 billion for the construction of Package 2 and 3 (Bomdila-Nafra-Lada section), covering a distance of around 78.3 km. Additionally, he disclosed an estimated sanction of Rs 2.79 billion for Package 7, encompassing the 15.4 km-long Lada-Sarli Section. Both these sections will be executed using the Engineering, Procurement, and Construction (EPC) mode.
Earlier, on February 06, the ministry had allocated an estimated Rs 38.90 billion for the Lada-Sarli section, Sarli-Huri section, and Kharsang-Miao-Vijaynagar-Gandhigram section, collectively spanning 202.14 km.
The Frontier Highway (NH-913) is envisioned to address migration challenges and promote reverse migration to the border areas of Arunachal Pradesh. Furthermore, it will establish connections across vital river basins and support the development of numerous hydropower projects in the state, as highlighted by the Road Transport and Highways Minister.
Next Story
Mahindra Lifespaces Targets Rs 10,000 Bn Sales by FY30
Mahindra Lifespace Developers aims to more than treble its sales to Rs 100 Bn by financial year twenty thirty, up from Rs 33 Bn in financial year twenty twenty-five. Backed by a strong land bank, robust pipeline, and rights issue of Rs 15 Bn, the company is focusing on growth in premium housing and industrial leasing.The company鈥檚 gross development value (GDV) has grown from Rs 44 Bn in financial year twenty twenty-four to Rs 181 Bn in financial year twenty twenty-five, with the current pipeline at Rs 390 Bn. New launches are planned in Whitefield, Malad, Bhandup, Mahalaxmi and Pune.Mahindra..
Next Story
Bhubaneswar New Station Starts Three Express Trains to Ease Congestion
East Coast Railway has begun full-scale operations of three major express trains from the Bhubaneswar New Railway Station (BBSN) from 12 May 2025. The move aims to improve connectivity and reduce congestion at the Bhubaneswar Main Station.The trains now operating from BBSN include the Mumbai鈥揃hubaneswar Konark Express, the Secunderabad鈥揃hubaneswar Visakha Express, and the Bhubaneswar鈥揤isakhapatnam Intercity Express. All three were previously routed through the Bhubaneswar Main Station.BBSN, located in northern Bhubaneswar, is expected to benefit residents of northern city zones, Cuttack,..
Next Story
Indian Railways Clears Survey for New Line in Sikkim
The Ministry of Railways has approved a Final Location Survey for a proposed railway line in Sikkim, connecting Melli to Dentam via Jorethang and Legship. The Rs 22.5 Mn survey will be conducted by Northeast Frontier Railway to assess technical and financial feasibility.The planned 75-kilometre corridor aims to improve rail access in the under-served southern and western regions of Sikkim. The project is backed by Railway Minister Ashwini Vaishnaw and follows efforts by Member of Parliament Indra Hang Subba.This new line is intended to extend the under-construction Sivok鈥揜angpo railway proje..