MMRDA Extends Bid Submission Deadline for Elevated Corridor Project
22 Jun 2023
2 Min Read
CW Team
Mumbai Metropolitan Region Development Authority, Engineering department has published a CORRIGENDUM NOTICE for the due date extension of bid submission for the Appointment of PMC Authority Engineer for the work of Construction of Elevated Corridor from Mumbai Pune Expressway to MTHL Interchange at Chirle From NH 48 Km 105400 to Km 108 150 and from NH 348 Km 12 500 to Km 17 100 2ND CALL.
A complete bid document can be downloaded from the MMRDA e-Tendering Portal:
Bid submission end date is extended to 6-Jul-2023 from its initial deadline of 20.06.2023.
The tender seeks consultancy services of Rs 9,97,96,42,080 crore. As per the tender, the bid validity will be 120 days, and it will be an open bidding process. The bid submission began on 2, 2023, and end on July 6, 2023.
Tender Document and Supporting can be downloaded for reference purpose from the e- Tendering Portal of MMRDA during the period mentioned in the tender notice. Interested Bidders have to make online payment of Rs. 10,000/- (Rupees Ten Thousand only) Plus 18% GST as Tender Processing Fee (non-refundable) using online payment gateway during bid preparation using Debit Card/Credit Card/Net-Banking.
The Successful bidder will have to submit the rate analysis of all major items, if called for.
The bidder should visit the site prior to submission of tender and ascertain the local site condition, working restrictions, constraints, conditions in tender document regarding necessary approvals, NOC required for the work from the local Authorities and shall quote the offer inclusive of all such expenses likely to be incurred while execution of the work. No claim or compensation for any extra payments incurred by the bidders towards the approvals/ NOC鈥檚/ permissions will be entertained by MMRDA, which shall be noted.
Experience as Project Management Consultant (Authority Engineer) for Construction of Civil engineering infrastructure works for Govt. / Semi. Govt. works for last 10 years as on bid due date.
Minimum average annual financial turnover of INR 10.00 Crore in last three financial years ending 31st March 2022 in the Consultancy services as certified by Chartered Accountant.
Essential details:
Project Estimated Value: 鈧� 9,97,96,42,080
Product Category: Consultancy services
Bid Validity (Days): 120
Period of Work: NIL
Tender ID: 2023_MMRDA_882418_2
Tender Ref. No.: 2023/MMRDA/ENG/PMC
Payment mode: Online
Form of contract: Lump-sum
Mumbai Metropolitan Region Development Authority, Engineering department has published a CORRIGENDUM NOTICE for the due date extension of bid submission for the Appointment of PMC Authority Engineer for the work of Construction of Elevated Corridor from Mumbai Pune Expressway to MTHL Interchange at Chirle From NH 48 Km 105400 to Km 108 150 and from NH 348 Km 12 500 to Km 17 100 2ND CALL.
A complete bid document can be downloaded from the MMRDA e-Tendering Portal: https://mahatenders.gov.in
Bid submission end date is extended to 6-Jul-2023 from its initial deadline of 20.06.2023.
The tender seeks consultancy services of Rs 9,97,96,42,080 crore. As per the tender, the bid validity will be 120 days, and it will be an open bidding process. The bid submission began on 2, 2023, and end on July 6, 2023.
Tender Document and Supporting can be downloaded for reference purpose from the e- Tendering Portal of MMRDA during the period mentioned in the tender notice. Interested Bidders have to make online payment of Rs. 10,000/- (Rupees Ten Thousand only) Plus 18% GST as Tender Processing Fee (non-refundable) using online payment gateway during bid preparation using Debit Card/Credit Card/Net-Banking.
The Successful bidder will have to submit the rate analysis of all major items, if called for.
The bidder should visit the site prior to submission of tender and ascertain the local site condition, working restrictions, constraints, conditions in tender document regarding necessary approvals, NOC required for the work from the local Authorities and shall quote the offer inclusive of all such expenses likely to be incurred while execution of the work. No claim or compensation for any extra payments incurred by the bidders towards the approvals/ NOC鈥檚/ permissions will be entertained by MMRDA, which shall be noted.
Experience as Project Management Consultant (Authority Engineer) for Construction of Civil engineering infrastructure works for Govt. / Semi. Govt. works for last 10 years as on bid due date.
Minimum average annual financial turnover of INR 10.00 Crore in last three financial years ending 31st March 2022 in the Consultancy services as certified by Chartered Accountant.
Essential details:
Project Estimated Value: 鈧� 9,97,96,42,080
Product Category: Consultancy services
Bid Validity (Days): 120
Period of Work: NIL
Tender ID: 2023_MMRDA_882418_2
Tender Ref. No.: 2023/MMRDA/ENG/PMC
Payment mode: Online
Form of contract: Lump-sum
Next Story
South West Pinnacle Wins Rs 30 Cr Oman Mining Contract
South West Pinnacle Exploration Ltd has secured a Rs 30 crore contract from Minerals Development Oman (MDO) for mining exploration in concession areas 12B and 13.The two-year project will be carried out via Alara Resources LLC, a JV in Oman. MDO, backed by Oman鈥檚 investment authorities, focuses on monetising mineral wealth.The contract covers copper, gold, and chromite and highlights South West Pinnacle鈥檚 growing footprint in international exploration and mining services.
..
Next Story
Godrej GEG Boosts Intralogistics with AI and Green Tech
Godrej Enterprises Group (GEG) is revolutionising warehouse and factory logistics through its Material Handling Equipment and Storage Solutions arms by integrating AI, IoT, and automation.With 20鈥�25% market share and 85% local sourcing, GEG champions Atmanirbhar Bharat and sustainability. The Chennai plant, a green manufacturing leader, uses RoHS-compliant materials and has slashed energy consumption by 60%.GEG serves e-commerce, FMCG, retail, and cold chains with high-performance racking and electric forklifts. Upcoming IoT-enabled forklifts and telematics solutions aim to improve speed, sa..
Next Story
Amit Shah Inaugurates Key Projects Across Gujarat
Union 亚博体育官网首页 Minister Amit Shah inaugurated and laid the foundation stone for various projects in Gujarat鈥檚 Panchmahal district and Ahmedabad.In Godhra, he inaugurated the Center of Excellence building, sports complex, reservoir, and Miyawaki plantation. In Ahmedabad, he unveiled a new cooperative complex in Adaroda village and a primary school in Juwal.These projects, under the Model Co-op Village scheme, aim to boost education, sustainability, and rural development across the state.
..