亚博体育官网首页

Mumbai Coastal road development work in full swing
ROADS & HIGHWAYS

Mumbai Coastal road development work in full swing

After the Supreme Court vacated the stay over development work - construction of gardens and parking lots - on land reclaimed for the Coastal Road Project (CRP), the BMC decided to rev up all its engines to begin work immediately. The body has already completed over 62 per cent of the road work and almost 70 per cent of mining work for the second tunnel, sources said.

Work on the 10.58 km CRP, stretching from the Princes Street flyover to the southern end of Bandra-Worli Sea Link, began in 2018. After non-profits approached the apex court to stay the project citing climate change, only road work was allowed to be done. about 1.4 crore sq ft of land has been reclaimed for the project in total.

Around 75 per cent of the land will be used for landscaping and civic facilities like toilets, a track for jogging and cycling, a butterfly garden, a sea promenade, an open theatre, children's parks and playgrounds, police posts, bus stops, footpaths to cross the road, jetties. Three underground parking lots - near Mahalakshmi Temple and Haji Ali Dargah, Amar Sons Garden and Worli Dairy with a park on top - will also come up.

After the Supreme Court vacated the stay over development work - construction of gardens and parking lots - on land reclaimed for the Coastal Road Project (CRP), the BMC decided to rev up all its engines to begin work immediately. The body has already completed over 62 per cent of the road work and almost 70 per cent of mining work for the second tunnel, sources said. Work on the 10.58 km CRP, stretching from the Princes Street flyover to the southern end of Bandra-Worli Sea Link, began in 2018. After non-profits approached the apex court to stay the project citing climate change, only road work was allowed to be done. about 1.4 crore sq ft of land has been reclaimed for the project in total. Around 75 per cent of the land will be used for landscaping and civic facilities like toilets, a track for jogging and cycling, a butterfly garden, a sea promenade, an open theatre, children's parks and playgrounds, police posts, bus stops, footpaths to cross the road, jetties. Three underground parking lots - near Mahalakshmi Temple and Haji Ali Dargah, Amar Sons Garden and Worli Dairy with a park on top - will also come up.

Next Story
Resources

Hafele launches Platinum Studio in Nagpur

Hafele has expanded its franchise footprint in central India by opening a new Studio Partner Platinum showroom in Nagpur in collaboration with Onkar Furnitech. The studio was inaugurated by Nitin Gadkari, Minister of Road Transport and Highways, along with Padma Gupta, Director 鈥� HR & Customer Experience, Hafele South Asia.Located at Sarthak Plaza, South Ambazari Road, Laxmi Nagar, the showroom offers an immersive experience of Hafele鈥檚 wide-ranging interior and home solutions. Designed as a hands-on, real-life application space, the studio showcases Hafele鈥檚 full portfolio鈥攊ncludi..

Next Story
Resources

Truflo by Hindware wins GPTW honour again

Truflo by Hindware has been certified a Great Place to Work for the fourth consecutive year, reaffirming its commitment to a people-first culture. The certification was awarded by the Great Place to Work Institute following a rigorous evaluation of employee experience, leadership, culture, and HR practices.Known as India鈥檚 fastest-growing plastic pipes and fittings company, Truflo has focused on fostering an inclusive, innovative, and growth-driven work environment. The company prioritises employee well-being and professional development, creating a culture where people feel valued and empow..

Next Story
Infrastructure Transport

Ahmedabad鈥檚 Rs 1.17 Billion Flyover Opens

A major infrastructure milestone was achieved in Ahmedabad with the inauguration of a new Rs 1.17-billion flyover at Pallav Char Rasta on May 18.Union 亚博体育官网首页 and Cooperation Minister Amit Shah, who represents the Gandhinagar Lok Sabha constituency, unveiled the structure that was expected to ease vehicular congestion for nearly 1.5 lakh daily commuters navigating through the city鈥檚 busy Naranpura zone. The flyover, constructed across the 132-feet Ring Road, extended 935 metres in length and spanned 8.4 metres in width. It reached a height of 5.37 metres at the Pragatinagar junction and feature..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement