亚博体育官网首页

RVNL Wins Rs 5.54 Bn Highway Project in Andhra Pradesh
ROADS & HIGHWAYS

RVNL Wins Rs 5.54 Bn Highway Project in Andhra Pradesh

Rail Vikas Nigam (RVNL) has secured a Letter of Acceptance from the National Highway Authority of India (NHAI) for a significant infrastructure project in Andhra Pradesh. The project, valued at Rs 5.54 billion, involves the construction of a six-lane access-controlled road connecting Visakhapatnam Port from the Sabbavaram bypass to the Sheelanagar junction. The 12.66-kilometre stretch will be developed under the Hybrid Annuity Mode (HAM) as part of National Highway (NH) 516C.

As per the contract terms, the project is expected to be completed within 730 days. The initiative aims to enhance connectivity to Visakhapatnam Port, improving traffic flow and logistical efficiency in the region. The contract falls under RVNL鈥檚 regular business operations and does not involve any related party transactions.

Following the announcement, RVNL鈥檚 stock saw an increase, trading at Rs 372.25 on the NSE, reflecting a rise of Rs 14.35 or 4.01 per cent at 10:15 AM. The project is part of the government's broader efforts to strengthen transportation infrastructure and facilitate economic growth in Andhra Pradesh.

News source: The Hindu Businessline

Rail Vikas Nigam (RVNL) has secured a Letter of Acceptance from the National Highway Authority of India (NHAI) for a significant infrastructure project in Andhra Pradesh. The project, valued at Rs 5.54 billion, involves the construction of a six-lane access-controlled road connecting Visakhapatnam Port from the Sabbavaram bypass to the Sheelanagar junction. The 12.66-kilometre stretch will be developed under the Hybrid Annuity Mode (HAM) as part of National Highway (NH) 516C. As per the contract terms, the project is expected to be completed within 730 days. The initiative aims to enhance connectivity to Visakhapatnam Port, improving traffic flow and logistical efficiency in the region. The contract falls under RVNL鈥檚 regular business operations and does not involve any related party transactions. Following the announcement, RVNL鈥檚 stock saw an increase, trading at Rs 372.25 on the NSE, reflecting a rise of Rs 14.35 or 4.01 per cent at 10:15 AM. The project is part of the government's broader efforts to strengthen transportation infrastructure and facilitate economic growth in Andhra Pradesh. News source: The Hindu Businessline

Next Story
Infrastructure Urban

Tamil Nadu Plans Pennaiyar-Cheyyar Link to Boost Irrigation

The Tamil Nadu government is advancing plans to interlink the Pennaiyar and Cheyyar rivers to improve irrigation for the Nandan canal system and support agricultural activities across approximately 9,000 acres in the Villupuram and Tiruvannamalai districts.The State Water Resources Department (WRD) has submitted a detailed project report (DPR) for Phase I of the scheme, with an estimated cost of Rs 3.9 billion. The proposal involves the excavation of a 12.45-kilometre main canal and a 16.55-kilometre feeder canal, drawing water from the foreshore of the Sathanur Reservoir to the Keeranur Dam v..

Next Story
Infrastructure Transport

Trial Run This Week for Thane鈥檚 First Metro Line

Thane district鈥檚 first-ever Metro rail line鈥擬umbai Metro Red Line 9鈥攊s poised for its trial run this week, marking a key milestone in regional connectivity. The overhead traction wires were energised on Saturday, clearing the way for dynamic testing between Dahisar and Kashigaon. Chief Minister Devendra Fadnavis is expected to flag off the inaugural run.Metro Line 9 is an extension of Red Line 7, linking Andheri (Western Express Highway) to Bhayandar via Mira-Bhayandar. In its first phase, it will connect Andheri to Kashimira, with future expansion reaching Subhash Chandra Bose Stadium i..

Next Story
Infrastructure Transport

Metro Line 3 Sees Rider Surge After Phase 2 Launch

The newly opened second phase of Mumbai Metro Line 3鈥攆rom Bandra-Kurla Complex (BKC) to Acharya Atre Chowk in Worli鈥攈as seen a strong rise in passenger numbers over its first weekend of operations. As per official data, 32,725 commuters travelled on the Aqua Line from Aarey (JVLR) to Acharya Atre Chowk by 8:00 PM on Sunday, nearly 6,000 more than the 26,758 recorded during the same time on Saturday.This surge follows the inauguration of the line鈥檚 second phase on Saturday, a key milestone in enhancing Mumbai鈥檚 rapid transit network. The extension enables direct north-south travel from ..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement