Sinhagad Road Flyover Phase 2 Opens, Cuts Travel by 30 Minutes
08 May 2025
2 Min Read
CW Team
Commuters on Pune’s Sinhagad Road can now expect faster, smoother rides as the second phase of the much-anticipated flyover—stretching 2.2 km from Vitthalwadi Arch to Fun Time Theatre—was inaugurated on May 1 by Maharashtra Deputy Chief Minister Ajit Pawar.
Designed to ease traffic for over 1.5 lakh vehicles daily, the flyover bypasses five major junctions—Inamdar Chowk, Hingne Chowk, Santosh Hall Chowk, Datta Hotel Chowk, and Goyal Ganga Chowk—cutting travel time by up to 30 minutes and reducing fuel use and pollution.
Present at the event were Union Minister Murlidhar Mohol, MP Medha Kulkarni, MLA Hemant Rasane, Municipal Commissioner Dr. Rajendra Bhosale, and other civic officials.
Deputy CM Pawar called the project a key step toward decongesting rapidly expanding suburbs like Vadgaon, Dhayari, Narhe, Nanded, and Khadakwasla. He also highlighted future traffic solutions, including a tunnel project from Yerwada, a Rs 2,000 crore push for electric vehicles, and riverfront beautification plans.
Municipal Commissioner Dr. Bhosale noted that despite pandemic-related delays, the flyover work, which began in September 2021, was completed with steady progress. "This structure will provide major relief to commuters from Khadakwasla, Narhe, and surrounding areas," he said.
Project Snapshot:
- Total cost: Rs 1.18 billion
- Phase 1 (520 m): Opened Aug 2024, near Rajaram Bridge
- Phase 2 (2.2 km): Now operational
- Phase 3 (1.5 km): From Indian Hume Gate to Inamdar Chowk, due June 15, 2025
- Construction: Prestressed box girder, 7.3 m wide, 60 pillars
Commuter Benefits:
- 30-minute ride cut to just 5 minutes
- Bypasses five busy junctions
- Significant reduction in fuel use and emissions
- Safer pedestrian crossings
Commuters on Pune’s Sinhagad Road can now expect faster, smoother rides as the second phase of the much-anticipated flyover—stretching 2.2 km from Vitthalwadi Arch to Fun Time Theatre—was inaugurated on May 1 by Maharashtra Deputy Chief Minister Ajit Pawar.Designed to ease traffic for over 1.5 lakh vehicles daily, the flyover bypasses five major junctions—Inamdar Chowk, Hingne Chowk, Santosh Hall Chowk, Datta Hotel Chowk, and Goyal Ganga Chowk—cutting travel time by up to 30 minutes and reducing fuel use and pollution.Present at the event were Union Minister Murlidhar Mohol, MP Medha Kulkarni, MLA Hemant Rasane, Municipal Commissioner Dr. Rajendra Bhosale, and other civic officials.Deputy CM Pawar called the project a key step toward decongesting rapidly expanding suburbs like Vadgaon, Dhayari, Narhe, Nanded, and Khadakwasla. He also highlighted future traffic solutions, including a tunnel project from Yerwada, a Rs 2,000 crore push for electric vehicles, and riverfront beautification plans.Municipal Commissioner Dr. Bhosale noted that despite pandemic-related delays, the flyover work, which began in September 2021, was completed with steady progress. This structure will provide major relief to commuters from Khadakwasla, Narhe, and surrounding areas, he said.Project Snapshot:Total cost: Rs 1.18 billionPhase 1 (520 m): Opened Aug 2024, near Rajaram BridgePhase 2 (2.2 km): Now operationalPhase 3 (1.5 km): From Indian Hume Gate to Inamdar Chowk, due June 15, 2025Construction: Prestressed box girder, 7.3 m wide, 60 pillarsCommuter Benefits:30-minute ride cut to just 5 minutesBypasses five busy junctionsSignificant reduction in fuel use and emissionsSafer pedestrian crossings
Next Story
Ganga Expressway Adopts AI for Real-Time Road Quality Checks
The Yogi Adityanath government has partnered with ETH Zurich and RTDT Laboratories AG to deploy artificial intelligence and sensor-based technology on the Ganga Expressway. This system enables real-time monitoring of construction quality, enhancing both safety and ride comfort.Spanning five hundred and ninety-four kilometres across twelve districts from Meerut to Prayagraj, the Ganga Expressway will be India’s longest. A specially designed Innova vehicle fitted with seven accelerometers now scans all six lanes for surface uniformity and elevation consistency.Unlike traditional methods conduc..
Next Story
Bihar Approves Rs 330 Billion Road Upgrade Plan for FY26
The Ministry of Road Transport and Highways has approved Bihar’s Rs 330 Bn road development plan for financial year twenty twenty-six. The announcement was made by Road Construction Minister Nitin Naveen, outlining projects aimed at boosting infrastructure and economic growth.Detailed Project Reports have been prepared for works worth Rs 180 to 190 Bn, with construction expected to begin before 15 August upon central approval. Around Rs 199.81 Bn will be spent to upgrade five hundred and twenty-six kilometres of roads to two-lane and four-lane highways.Eight major roads have been approved, i..
Next Story
Reay Road Bridge Inaugurated to Ease South Mumbai Traffic
South Mumbai will unveil the Reay Road Bridge on 13 May 2025, marking a major milestone in the city’s infrastructure development. This is Mumbai’s first land-based cable-stayed road overbridge and spans three hundred and eighty-five metres, connecting Byculla and Mazgaon.The six-lane structure includes pedestrian pathways and aims to ease congestion while improving connectivity. The project began on 14 February 2022 after demolition of the earlier British-era bridge. Though construction was completed in December 2024, the formal inauguration is scheduled six months later.Built at an estima..