Telangana to Build Rs 40.3 Billion Ratan Tata Road
04 Mar 2025
2 Min Read
CW Team
The Telangana government is set to launch the 41.5-km Ratan Tata Road, a Rs 40.3 billion Greenfield Radial Road project aimed at enhancing urban mobility and infrastructure. The road will connect the Outer Ring Road (ORR) at the Tata Interchange in Raviryal with the Regional Ring Road (RRR) at Amangal, improving connectivity and development across the region.
Traversing six mandals and 14 villages in the Rangareddy district, the project will be executed in two phases: the 19.2-km stretch from ORR to Meerkhanpet at Rs 16.65 billion, and the 22.3-km stretch from Meerkhanpet to RRR at Rs 23.65 billion. The Hyderabad Metropolitan Development Authority (HMDA) and Hyderabad Growth Corridor Limited (HGCL) will oversee its implementation.
Designed as a six-lane access-controlled expressway, the road will have a 100-metre-wide layout, including service roads, greenbelts, cycle tracks, footpaths, and utility corridors, with provisions for future expansion to eight lanes. A central median has been reserved for potential metro or railway corridors, ensuring the project’s long-term sustainability.
Bids for the project will be invited on February 28, with technical bids set to open on March 21. The Ratan Tata Road is expected to reduce congestion, support equitable urban development, and provide efficient transport for residents and businesses, reflecting Telangana’s commitment to eco-friendly and future-ready infrastructure.
(urbanacres)
The Telangana government is set to launch the 41.5-km Ratan Tata Road, a Rs 40.3 billion Greenfield Radial Road project aimed at enhancing urban mobility and infrastructure. The road will connect the Outer Ring Road (ORR) at the Tata Interchange in Raviryal with the Regional Ring Road (RRR) at Amangal, improving connectivity and development across the region.Traversing six mandals and 14 villages in the Rangareddy district, the project will be executed in two phases: the 19.2-km stretch from ORR to Meerkhanpet at Rs 16.65 billion, and the 22.3-km stretch from Meerkhanpet to RRR at Rs 23.65 billion. The Hyderabad Metropolitan Development Authority (HMDA) and Hyderabad Growth Corridor Limited (HGCL) will oversee its implementation.Designed as a six-lane access-controlled expressway, the road will have a 100-metre-wide layout, including service roads, greenbelts, cycle tracks, footpaths, and utility corridors, with provisions for future expansion to eight lanes. A central median has been reserved for potential metro or railway corridors, ensuring the project’s long-term sustainability.Bids for the project will be invited on February 28, with technical bids set to open on March 21. The Ratan Tata Road is expected to reduce congestion, support equitable urban development, and provide efficient transport for residents and businesses, reflecting Telangana’s commitment to eco-friendly and future-ready infrastructure.(urbanacres)
Next Story
Mumbai-Ahmedabad Bullet Train Set to Launch by 2028
India’s first bullet train is set to revolutionize high-speed travel along the western corridor, with the Mumbai-Ahmedabad high-speed rail project aiming for a 2028 launch. This announcement marks a major milestone in India’s infrastructure goals, as it promises to reduce travel time between the two economic hubs from eight hours to just three.Spanning a planned 508-kilometre stretch, the corridor stands as a flagship example of Indo-Japanese collaboration in technology and engineering. Once operational, the train is expected to transform intercity mobility and place India among the select..
Next Story
Mumbai-Gandhinagar Train Service Enhances Passenger Capacity
The Mumbai Central–Gandhinagar Capital Vande Bharat Express has increased its passenger capacity by adding four additional AC chair car coaches to meet the growing commuter demand on one of India’s busiest business corridors. This upgrade, effective from 11 May, raised the train’s seating capacity from 1,128 to 1,440 passengers, allowing it to serve 936 more passengers daily in both directions. The increase was described as a practical measure to accommodate the surging demand on the busy Mumbai–Ahmedabad–Gandhinagar route, which regularly operates at over 150 percent seat occupancy...
Next Story
Delhi Plans 12 Sewage Plants to Clean Najafgarh Drain Efficiently
Delhi’s ambitious plan to improve the water quality of the Yamuna River has gained significant momentum as the Delhi Jal Board (DJB) has begun work on 12 new sewage treatment plants (STPs) aimed at reducing the volume of untreated sewage being discharged from the Najafgarh Drain.This initiative forms part of the ongoing efforts to clean the Yamuna and restore the river’s health, which has long been a critical environmental issue for the national capital. Given the alarming pollution levels in the Yamuna, experts and officials consider this project a vital step toward addressing the persist..