亚博体育官网首页

Final Trial Run Completed on Katra-Budgam Track of USBRL
RAILWAYS & METRO RAIL

Final Trial Run Completed on Katra-Budgam Track of USBRL

The trial run on the Katra-Budgam railway track, part of the Udhampur-Srinagar-Baramulla Rail Link (USBRL), was successfully completed on Sunday. The 18-coach trial train departed from Katra railway station at 8 a.m. and reached Budgam, marking the completion of the final trial on the 326 km track. 

The USBRL project, completed at a cost of Rs 410 billion, includes a 111 km section of tunnels, with the T-49 tunnel being the longest railway tunnel in India at 12.77 km. Additionally, the world鈥檚 highest railway bridge, the Chenab Bridge, was constructed over the Chenab River in the Reasi district of Jammu and Kashmir. This iconic steel and concrete arch bridge spans 1,315 meters with a 467-meter arch and stands at a height of 359 meters above the river bed. 

Indian Railways has also constructed its first cable-stayed bridge over the Anji Khad, which features a deck 331 meters above the riverbed and a main pylon 193 meters tall. The bridge, supported by a single pylon, rises to a height of 1,086 feet, equivalent to a 77-story building. 

The USBRL, through its challenging construction over mountainous terrains, rivers, and adverse weather conditions, is considered one of the most ambitious railway projects in the world. It is expected to enhance Kashmir鈥檚 horticulture, agriculture, tourism, trade, and education, and offer a more convenient and affordable travel option for citizens. 

The inauguration of the rail link, which will include Vande Bharat trains operating between Katra and Baramulla, is anticipated to take place soon, with Prime Minister Narendra Modi expected to officiate the event. The official inauguration date is yet to be announced. 

The trial run on the Katra-Budgam railway track, part of the Udhampur-Srinagar-Baramulla Rail Link (USBRL), was successfully completed on Sunday. The 18-coach trial train departed from Katra railway station at 8 a.m. and reached Budgam, marking the completion of the final trial on the 326 km track. The USBRL project, completed at a cost of Rs 410 billion, includes a 111 km section of tunnels, with the T-49 tunnel being the longest railway tunnel in India at 12.77 km. Additionally, the world鈥檚 highest railway bridge, the Chenab Bridge, was constructed over the Chenab River in the Reasi district of Jammu and Kashmir. This iconic steel and concrete arch bridge spans 1,315 meters with a 467-meter arch and stands at a height of 359 meters above the river bed. Indian Railways has also constructed its first cable-stayed bridge over the Anji Khad, which features a deck 331 meters above the riverbed and a main pylon 193 meters tall. The bridge, supported by a single pylon, rises to a height of 1,086 feet, equivalent to a 77-story building. The USBRL, through its challenging construction over mountainous terrains, rivers, and adverse weather conditions, is considered one of the most ambitious railway projects in the world. It is expected to enhance Kashmir鈥檚 horticulture, agriculture, tourism, trade, and education, and offer a more convenient and affordable travel option for citizens. The inauguration of the rail link, which will include Vande Bharat trains operating between Katra and Baramulla, is anticipated to take place soon, with Prime Minister Narendra Modi expected to officiate the event. The official inauguration date is yet to be announced. 

Next Story
Infrastructure Transport

Mumbai-Ahmedabad Bullet Train Set to Launch by 2028

India鈥檚 first bullet train is set to revolutionize high-speed travel along the western corridor, with the Mumbai-Ahmedabad high-speed rail project aiming for a 2028 launch. This announcement marks a major milestone in India鈥檚 infrastructure goals, as it promises to reduce travel time between the two economic hubs from eight hours to just three.Spanning a planned 508-kilometre stretch, the corridor stands as a flagship example of Indo-Japanese collaboration in technology and engineering. Once operational, the train is expected to transform intercity mobility and place India among the select..

Next Story
Infrastructure Transport

Mumbai-Gandhinagar Train Service Enhances Passenger Capacity

The Mumbai Central鈥揋andhinagar Capital Vande Bharat Express has increased its passenger capacity by adding four additional AC chair car coaches to meet the growing commuter demand on one of India鈥檚 busiest business corridors. This upgrade, effective from 11 May, raised the train鈥檚 seating capacity from 1,128 to 1,440 passengers, allowing it to serve 936 more passengers daily in both directions. The increase was described as a practical measure to accommodate the surging demand on the busy Mumbai鈥揂hmedabad鈥揋andhinagar route, which regularly operates at over 150 percent seat occupancy...

Next Story
Infrastructure Urban

Delhi Plans 12 Sewage Plants to Clean Najafgarh Drain Efficiently

Delhi鈥檚 ambitious plan to improve the water quality of the Yamuna River has gained significant momentum as the Delhi Jal Board (DJB) has begun work on 12 new sewage treatment plants (STPs) aimed at reducing the volume of untreated sewage being discharged from the Najafgarh Drain.This initiative forms part of the ongoing efforts to clean the Yamuna and restore the river鈥檚 health, which has long been a critical environmental issue for the national capital. Given the alarming pollution levels in the Yamuna, experts and officials consider this project a vital step toward addressing the persist..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement