Integral Coach Factory to introduce new Train 18 prototype
17 Aug 2021
2 Min Read
CW Team
Integral Coach Factory (ICF) is set to introduce a new prototype of Train 18 - Vande Bharat Express semi-high-speed trains in the current production year with improved features.
According to an ICF official, the first prototype rake will be sent out in March 2022 and will be ready for commercial use by June 2022.
Prime Minister Narendra Modi declared 75 Vande Bharat trains will connect different parts of the country in 75 weeks to commemorate the ongoing Azadi ka Amrit Mahotsav in a speech from the Red Fort on Sunday, comparing the Vande Bharat train initiative to the UDAN flight scheme.
The Vande Bharat train sets (44 rakes of 16 cars each) were finalised in January by the Indian Railways. They will be manufactured at three production units鈥擨CF (24 rakes); Rail Coach Factory in Kapurthala (10) and Modern Coach Factory in RaeBareli (10).
Around 75% of the components will be made in the United States. According to media, the Hyderabad-based Medha Servo Drives Ltd was awarded the $2,211 crore contract in January for the design, development, manufacture, supply, integration, testing, and commissioning of three-phase propulsion for train sets.
On the New Delhi-Varanasi and New Delhi-Katra sectors, the ICF began rolling out these trains in October 2018, and they were later designated as Vande Bharat. The IR tasked the ICF with building 720 coaches for the 45 Vande Bharat Express trains in December 2019, but due to Covid-19 lockdown, this was reduced to 240 coaches a year later.
There were also claims that a particular company was given preferential treatment and that safety features were harmed. Train18's specifications were returned to the drawing board. Four emergency windows, disaster lights in all coaches, an emergency push button, centralised coach monitoring, and increased flood protection of underframe equipment will be among the new Train 18's better features, according to an ICF official.
Also read: Indian Railways aims to modernise manufacturing
Also read: Railways to roll out 10 Vande Bharat trains connecting 40 cities
Integral Coach Factory (ICF) is set to introduce a new prototype of Train 18 - Vande Bharat Express semi-high-speed trains in the current production year with improved features.
According to an ICF official, the first prototype rake will be sent out in March 2022 and will be ready for commercial use by June 2022.
Prime Minister Narendra Modi declared 75 Vande Bharat trains will connect different parts of the country in 75 weeks to commemorate the ongoing Azadi ka Amrit Mahotsav in a speech from the Red Fort on Sunday, comparing the Vande Bharat train initiative to the UDAN flight scheme.
The Vande Bharat train sets (44 rakes of 16 cars each) were finalised in January by the Indian Railways. They will be manufactured at three production units鈥擨CF (24 rakes); Rail Coach Factory in Kapurthala (10) and Modern Coach Factory in RaeBareli (10).
Around 75% of the components will be made in the United States. According to media, the Hyderabad-based Medha Servo Drives Ltd was awarded the $2,211 crore contract in January for the design, development, manufacture, supply, integration, testing, and commissioning of three-phase propulsion for train sets.
On the New Delhi-Varanasi and New Delhi-Katra sectors, the ICF began rolling out these trains in October 2018, and they were later designated as Vande Bharat. The IR tasked the ICF with building 720 coaches for the 45 Vande Bharat Express trains in December 2019, but due to Covid-19 lockdown, this was reduced to 240 coaches a year later.
There were also claims that a particular company was given preferential treatment and that safety features were harmed. Train18's specifications were returned to the drawing board. Four emergency windows, disaster lights in all coaches, an emergency push button, centralised coach monitoring, and increased flood protection of underframe equipment will be among the new Train 18's better features, according to an ICF official.
Image Source
Also read: Indian Railways aims to modernise manufacturing
Also read: Railways to roll out 10 Vande Bharat trains connecting 40 cities
Next Story
ClickPost Launches Atlas to Benchmark E-commerce Logistics
ClickPost, a leading logistics intelligence platform, has launched Atlas, a subscription-based benchmarking tool designed to transform how e-commerce brands strategise logistics. Powered by ClickPost鈥檚 proprietary network, which processes over 50 million shipments each month, Atlas enables brands to benchmark key operational metrics in real time against industry peers and standards.Unlike traditional dashboards, Atlas delivers comparative insights鈥攆rom fulfilment speeds, RTO rates and average order values to city-level delivery times and sales data鈥攁llowing brands to identify operational..
Next Story
Kalyani Launches Two New LivingTree Towers in Bengaluru
Bengaluru-based Kalyani Developers has announced the launch of Towers 3 and 4 at its flagship residential project, Kalyani LivingTree, located in KIADB Aerospace Park. The expansion adds 525 premium 3BHK apartments, ranging from 1300 to 1600 sq ft, and over 7.5 lakh sq ft of built-up area. Prices start from Rs 1.2 crore.These towers, the most exclusive in Phase 1, offer uninterrupted pool and landscape views, and access to over 60 lifestyle amenities, two clubhouses totalling 1 lakh sq ft, and more than 80 per cent open space.LivingTree spans 25 acres and will comprise ten towers of 23鈥�24 fl..
Next Story
Blue Water Logistics IPO opens May 27
Hyderabad-based Blue Water Logistics is launching its Rs 40.5 crore IPO on May 27, 2025, which will remain open for subscription until May 29. The price band has been set at Rs 132 to Rs 135 per share, with a lot size of 1,000 shares. This is a book-built issue entirely comprising a fresh issue of 30 lakh equity shares. The IPO will be listed on the NSE Emerge platform.Smart Horizon Capital Advisors is the sole book-running lead manager, while Maashitla Securities will act as the registrar. The anchor book will open on May 26, 2025. The IPO allocates 8,35,000 shares to anchor investors, 1,56,0..