亚博体育官网首页

PM Modi may launch Chennai-Tirunelveli Vande Bharat Train on Sep 24
RAILWAYS & METRO RAIL

PM Modi may launch Chennai-Tirunelveli Vande Bharat Train on Sep 24

Prime Minister Narendra Modi was scheduled to inaugurate the Tirunelveli ? Chennai Vande Bharat Express Train via video conference. It was mentioned that the first train would depart from Tirunelveli Junction around noon and was expected to reach the capital city in approximately 7.5 hours. It was also noted that the train would arrive at its starting location for mandatory trials before the launch event. Additionally, Southern Railway was set to receive two more Vande Bharat trains.

After its initial run, it was anticipated that the Tirunelveli-Chennai train would typically leave at 6 am and arrive in Chennai around 1:50 pm. The return journey was set to commence at 2:50 pm on all days except Tuesdays from the state capital. According to reports, the locomotive would operate at an average speed of 83.30 km per hour and make stops at Virudhunagar, Madurai, Dindigul, and Tiruchi.

Details regarding fare prices had not been provided, and the total number of coaches was expected to vary based on demand.

It was mentioned that this would be Tamil Nadu's third Vande Bharat route, following the launch of the Chennai-Mysuru Vande Bharat Express in November of the previous year and subsequently the Chennai-Coimbatore Vande Bharat train. The reports came shortly after officials confirmed that the first Vande Metro would be introduced in January of the following year, followed by the Vande Bharat sleeper train in March 2024.

Prime Minister Narendra Modi was scheduled to inaugurate the Tirunelveli ? Chennai Vande Bharat Express Train via video conference. It was mentioned that the first train would depart from Tirunelveli Junction around noon and was expected to reach the capital city in approximately 7.5 hours. It was also noted that the train would arrive at its starting location for mandatory trials before the launch event. Additionally, Southern Railway was set to receive two more Vande Bharat trains. After its initial run, it was anticipated that the Tirunelveli-Chennai train would typically leave at 6 am and arrive in Chennai around 1:50 pm. The return journey was set to commence at 2:50 pm on all days except Tuesdays from the state capital. According to reports, the locomotive would operate at an average speed of 83.30 km per hour and make stops at Virudhunagar, Madurai, Dindigul, and Tiruchi. Details regarding fare prices had not been provided, and the total number of coaches was expected to vary based on demand. It was mentioned that this would be Tamil Nadu's third Vande Bharat route, following the launch of the Chennai-Mysuru Vande Bharat Express in November of the previous year and subsequently the Chennai-Coimbatore Vande Bharat train. The reports came shortly after officials confirmed that the first Vande Metro would be introduced in January of the following year, followed by the Vande Bharat sleeper train in March 2024.

Next Story
Infrastructure Transport

Bombay HC Orders MMRDA To Delay Bids for Thane-Ghodbunder Tunnel

The Bombay High Court directed the Mumbai Metropolitan Region Development Authority (MMRDA) to delay opening financial bids for the Thane-Ghodbunder to Bhayandar tunnel and elevated road project until Thursday. This followed a plea by construction firm Larsen & Toubro (L&T), which claimed it was not informed about the status of its bid while others were.The project, estimated to cost Rs six hundred billion, includes a 9.8 kilometre elevated road over Vasai Creek and is set to be the second longest such structure after the Atal Setu. It is planned as an extension of the Mumbai Coastal R..

Next Story
Infrastructure Energy

India Sets Up First Carbon Capture Testbeds for Cement Industry

India has launched five Carbon Capture and Utilisation (CCU) testbeds in the cement sector, forming the first innovation cluster to combat industrial carbon emissions. The Department of Science and Technology (DST) introduced this initiative to support the country鈥檚 climate goals and reduce emissions from carbon-intensive industries.CCU technology can trap carbon dioxide from cement manufacturing and convert it into valuable products such as synthetic fuels, urea, soda, chemicals, food-grade CO2, and concrete aggregates. This initiative aligns with India鈥檚 National Determined Contributions..

Next Story
Infrastructure Urban

Karnataka Considers One-Time Settlement of Contractor Dues

The Karnataka government is mulling a one-time settlement plan to address pending dues of Rs 320 billion owed by eight departments, including the Bruhat Bengaluru Mahanagara Palike (BBMP), to private contractors across the state.This proposal was discussed in a meeting between Deputy Chief Minister D K Shivakumar and Karnataka State Contractors鈥� Association president R Manjunath in Bengaluru. Manjunath noted that small- and medium-scale contractors were the most affected by the prolonged payment delays, with some waiting for up to two years.The Deputy Chief Minister directed officials to pri..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement