Larsen & Toubro Secures Contract from Defence Ministry
27 Dec 2024
2 Min Read
CW Team
The Ministry of Defence, Government of India, has awarded a significant contract to Larsen & Toubro (L&T) for supplying K9 Vajra-T Artillery Platforms to the Indian Army. As per the company's project classification, the contract is valued between Rs 50 billion and Rs 100 billion.
The K9 Vajra-T, a 155 mm, 52-calibre tracked self-propelled artillery platform, is an adaptation of the globally renowned South Korean K9 Thunder howitzer. It has been co-developed by L&T and Hanwha Aerospace to meet the Indian Army's specific operational needs across diverse terrains, including deserts, plains, and high-altitude regions.
L&T had previously secured the contract for the first batch of 100 K9 Vajra-T platforms in 2017 through global competitive bidding and successful field evaluation. The company delivered these platforms ahead of schedule, showcasing its expertise in designing, developing, and manufacturing complex defence systems. Since induction, the platforms have demonstrated exceptional performance.
Similar to the first batch, the second batch of K9 Vajra-T platforms will also be manufactured at L&T's Armoured Systems Complex in Hazira, Gujarat. This advanced manufacturing facility, inaugurated in January 2019 by Prime Minister Narendra Modi, has been pivotal in the development and production of armoured and artillery platforms. It operates within an integrated industrial ecosystem that includes numerous MSME partners.
Arun Ramchandani, Senior Vice President and Head of L&T Precision Engineering & Systems, noted that the facility continues to play a crucial role in supporting India's defence capabilities.
The Ministry of Defence, Government of India, has awarded a significant contract to Larsen & Toubro (L&T) for supplying K9 Vajra-T Artillery Platforms to the Indian Army. As per the company's project classification, the contract is valued between Rs 50 billion and Rs 100 billion.
The K9 Vajra-T, a 155 mm, 52-calibre tracked self-propelled artillery platform, is an adaptation of the globally renowned South Korean K9 Thunder howitzer. It has been co-developed by L&T and Hanwha Aerospace to meet the Indian Army's specific operational needs across diverse terrains, including deserts, plains, and high-altitude regions.
L&T had previously secured the contract for the first batch of 100 K9 Vajra-T platforms in 2017 through global competitive bidding and successful field evaluation. The company delivered these platforms ahead of schedule, showcasing its expertise in designing, developing, and manufacturing complex defence systems. Since induction, the platforms have demonstrated exceptional performance.
Similar to the first batch, the second batch of K9 Vajra-T platforms will also be manufactured at L&T's Armoured Systems Complex in Hazira, Gujarat. This advanced manufacturing facility, inaugurated in January 2019 by Prime Minister Narendra Modi, has been pivotal in the development and production of armoured and artillery platforms. It operates within an integrated industrial ecosystem that includes numerous MSME partners.
Arun Ramchandani, Senior Vice President and Head of L&T Precision Engineering & Systems, noted that the facility continues to play a crucial role in supporting India's defence capabilities.
Next Story
Infra.Market Becomes India鈥檚 Second-Largest Tile Maker
Infra.Market has emerged as India鈥檚 second-largest player in the ceramic tiles sector by installed capacity, with a total manufacturing capability of 81.57 million square metres. The company, a prominent name in the building materials space, operates 19 manufacturing plants and has seen a five-fold growth over the past three to four years. Backed by an investment of around Rs 1,400 crore, Infra.Market鈥檚 expansion has been powered by its multi-brand strategy and category diversification, enhancing its reach in both domestic and export markets.Currently, exports account for 25 to 30 per cent..
Next Story
FY25 Thermal Power Capacity Addition Misses Target
India added just 4.53 gigawatts (GW) of thermal power capacity in FY25, significantly below the 15.4 GW target, according to the Central Electricity Authority鈥檚 latest report. Of the planned 22 thermal units, only six were commissioned last fiscal year鈥攖wo in the central sector and four in state sectors.New units commissioned include Ghatampur TPP, Khurja SCTPP, Jawaharpur STPP, Bhusawal TPS, Panki TPS Extension, and Yadadri TPS, ranging from 660 MW to 800 MW. The commissioning of the remaining 16 units has been deferred to FY26.Delays are attributed to equipment supply issues, land acquis..
Next Story
Avaada in Talks with Global Lenders to Raise $1 Bn Project Debt
Avaada Group is in discussions with global lenders including Standard Chartered Bank, Sumitomo Mitsui Banking Corporation (SMBC), BNP Paribas, and Societe Generale to raise over $ one billion (Rs 85.00 billion) in project finance debt to support its renewable energy expansion.The company currently has 3,000 MWp of solar and wind projects under construction and aims to reach 30 GWp capacity by 2030. It plans investments of Rs 35,000 to 400.00 billion in solar, wind, pumped storage projects (PSP), and green hydrogen and ammonia production.Chairman Vineet Mittal noted the firm鈥檚 active engageme..