亚博体育官网首页

Kerala Launches Rs 11 Billion Infrastructure Project for Palakkad
SMART CITIES

Kerala Launches Rs 11 Billion Infrastructure Project for Palakkad

The Kerala government has launched the first phase of infrastructure development for the proposed Palakkad Smart City, part of the Kochi-Bengaluru Industrial Corridor. With an investment of Rs 11 billion, the project will transform over 1,400 acres in Puthussery Central and Kannambra into an Integrated Manufacturing Cluster.

Tenders have been invited for works including internal roads, drainage, bridges, water supply, firefighting, wastewater recycling, sewage treatment, and power distribution. Bids will soon be called for an Integrated Command and Control Centre, landscaping, and other urban infrastructure. These form part of an Engineering, Procurement, and Construction contract covering design, construction, and maintenance.

The Kerala Industrial Corridor Development Corporation Limited, a special purpose vehicle jointly held by the National Industrial Corridor Development and Implementation Trust and the Kerala government, will manage the project. The Kerala Infrastructure Investment Fund Board has invested Rs 14.89 billion for land acquisition. The Central government will contribute Rs 17.89 billion in phases.

Significant land and funding tranches have already been transferred to the SPV. The Kerala Industrial Infrastructure Development Corporation is facilitating land transfers and tendering. The Smart City aims to boost industrial growth, employment, and connectivity in the region.

Source:Elets News Network

The Kerala government has launched the first phase of infrastructure development for the proposed Palakkad Smart City, part of the Kochi-Bengaluru Industrial Corridor. With an investment of Rs 11 billion, the project will transform over 1,400 acres in Puthussery Central and Kannambra into an Integrated Manufacturing Cluster.Tenders have been invited for works including internal roads, drainage, bridges, water supply, firefighting, wastewater recycling, sewage treatment, and power distribution. Bids will soon be called for an Integrated Command and Control Centre, landscaping, and other urban infrastructure. These form part of an Engineering, Procurement, and Construction contract covering design, construction, and maintenance.The Kerala Industrial Corridor Development Corporation Limited, a special purpose vehicle jointly held by the National Industrial Corridor Development and Implementation Trust and the Kerala government, will manage the project. The Kerala Infrastructure Investment Fund Board has invested Rs 14.89 billion for land acquisition. The Central government will contribute Rs 17.89 billion in phases.Significant land and funding tranches have already been transferred to the SPV. The Kerala Industrial Infrastructure Development Corporation is facilitating land transfers and tendering. The Smart City aims to boost industrial growth, employment, and connectivity in the region.Source:Elets News Network

Next Story
Infrastructure Urban

DPIIT Extends Timeline for Safety Order on Electrical Appliances

The Department for Promotion of Industry and Internal Trade (DPIIT), Ministry of Commerce and Industry, has extended the implementation timeline for the Safety of Household, Commercial and Similar Electrical Appliances (Quality Control) Order, 2025. This decision follows stakeholder consultations chaired by Union Minister of Commerce and Industry Shri Piyush Goyal.The revised Quality Control Order (QCO) will come into force on 19 March 2026 for domestic large and medium enterprises and foreign manufacturers. The QCO covers electrical appliances intended for household, commercial, or similar us..

Next Story
Infrastructure Transport

Mumbai Metro Lines Four and Four A Set For Trial Runs Soon

The Mumbai Metropolitan Region Development Authority (MMRDA) is preparing to launch trial runs on a key 10-kilometre stretch spanning ten stations from Cadbury to Gaimukh on Metro Lines Four and Four A. These stations include Cadbury, Majiwada, Kapurbawadi, Manpada, Tikuji Ni Wadi, Dongripada, Vijay Garden, Kasarvadavli, Gownipada, and Gaimukh.While the designated depot for Metro Lines Four and Four A is still under construction, the MMRDA has devised an interim plan involving inspection pits beyond the Gaimukh terminal to facilitate early testing.Metro Line Four, which stretches 32.32 kilomet..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement