ÑDz©ÌåÓý¹ÙÍøÊ×Ò³

Telangana to receive 12 awards for sanitation and waste management
WATER & WASTE

Telangana to receive 12 awards for sanitation and waste management

Telangana has been designated one of the country's top two performing states, winning awards in 12 categories as part of the Swachh Survekshan 2021, Garbage Free City Rating 2021, and Safai Mitra Suraksha Challenge.

In its first-of-its-kind achievement, the state had won a dozen awards in various categories.

The awards will be presented by President Ram Nath Kovind at the Swachh Amrit Mahotsav, which will be held on November 20 at Vignan Bhavan in New Delhi by the Ministry of Housing and Urban Affairs (MoHUA).

Telangana State's Urban Local Bodies (ULBs) have won 12 awards in various categories for improving overall sanitation, citizen awareness, and waste management among 4,300 cities and towns.

In the category of metropolitan cities, the Greater Hyderabad Municipal Corporation (GHMC) has won the award for Garbage Free City Rating 2021.

Karimnagar Municipal Corporation will receive the Safai Mitra Suraksha Challenge, a first-of-its-kind challenge aimed at the safety and well-being of sanitation workers by promoting mechanised cleaning, under the less than three lakh population category.

GHMC, Nizampet Municipal Corporation, Siricilla, Siddipet, Nizampet, Ibrahimpatnam, Ghatkesar, Kosgi, Husnabad, and Secunderabad Cantonment are among the ULBs that will receive awards under Swachh Surveykshan 2021.

Over the last seven years, the State has received numerous awards in a variety of categories. Approximately 110 of 139 ULBs have achieved Open Defecation Free (ODF) status as a result of the Pattana Pragathi program's successful implementation over the last two years.

The city of GHMC has been designated as a Water Plus City. Telangana leads the way in terms of loan distribution to street vendors, with a 100% success rate through the Pradhan Mantri Sva Nidhi programme.

It has been the forerunner in planning and establishing Faecal Sludge Treatment Plants (FSTPs), with 12 completed, 15 nearing completion, 46 in the works, and six in the tendering process to help prevent water pollution.

Telangana has been designated one of the country's top two performing states, winning awards in 12 categories as part of the Swachh Survekshan 2021, Garbage Free City Rating 2021, and Safai Mitra Suraksha Challenge. In its first-of-its-kind achievement, the state had won a dozen awards in various categories. The awards will be presented by President Ram Nath Kovind at the Swachh Amrit Mahotsav, which will be held on November 20 at Vignan Bhavan in New Delhi by the Ministry of Housing and Urban Affairs (MoHUA). Telangana State's Urban Local Bodies (ULBs) have won 12 awards in various categories for improving overall sanitation, citizen awareness, and waste management among 4,300 cities and towns. In the category of metropolitan cities, the Greater Hyderabad Municipal Corporation (GHMC) has won the award for Garbage Free City Rating 2021. Karimnagar Municipal Corporation will receive the Safai Mitra Suraksha Challenge, a first-of-its-kind challenge aimed at the safety and well-being of sanitation workers by promoting mechanised cleaning, under the less than three lakh population category. GHMC, Nizampet Municipal Corporation, Siricilla, Siddipet, Nizampet, Ibrahimpatnam, Ghatkesar, Kosgi, Husnabad, and Secunderabad Cantonment are among the ULBs that will receive awards under Swachh Surveykshan 2021. Over the last seven years, the State has received numerous awards in a variety of categories. Approximately 110 of 139 ULBs have achieved Open Defecation Free (ODF) status as a result of the Pattana Pragathi program's successful implementation over the last two years. The city of GHMC has been designated as a Water Plus City. Telangana leads the way in terms of loan distribution to street vendors, with a 100% success rate through the Pradhan Mantri Sva Nidhi programme. It has been the forerunner in planning and establishing Faecal Sludge Treatment Plants (FSTPs), with 12 completed, 15 nearing completion, 46 in the works, and six in the tendering process to help prevent water pollution. Image Source

Next Story
Infrastructure Energy

EU and India Launch Rs 39.4 Bn Joint Green Tech Projects

In a move to tackle pressing environmental issues, the European Union and India have jointly launched two major research and innovation initiatives under the EU-India Trade and Technology Council (TTC), with a combined investment of EUR 41 million (Rs 3.94 billion).According to a statement by the EU Delegation to India, these projects focus on combatting marine pollution and developing waste-to-renewable hydrogen technologies, aligning with global sustainability goals and national policies such as India's National Marine Litter Policy and the EU’s Zero Pollution Action Plan.The first initiat..

Next Story
Infrastructure Energy

Jindal Arm Wins Rs 22 Bn Solar-Storage Project

BC Jindal Group, one of India’s leading business conglomerates with a turnover exceeding Rs 180 billion, announced that its renewable energy subsidiary, Jindal India Renewable Energy (JIRE), has secured a 300 MW solar-plus-storage project from state-owned SJVN.The project, part of SJVN’s 1,200 MW ISTS-connected solar tender with 600 MW/2,400 MWh battery energy storage systems (BESS), will be developed on a build-own-operate basis. JIRE won the bid at a tariff of Rs 3.32/kWh, and must commission the project within 24 months of signing the power purchase agreement (PPA).SJVN will procure pow..

Next Story
Infrastructure Energy

Adani Green Adds 50 MW to Khavda Solar Project

Adani Renewable Energy Fifty Six, a subsidiary of Adani Green Energy (AGEL), has operationalised an additional 50 megawatts (MW) of solar power capacity at its project in Khavda, Gujarat.With this latest development, AGEL’s total operational renewable energy generation capacity has risen to 14,340.9 MW, further consolidating its position as one of India’s leading green energy producers.Following the necessary regulatory approvals, the decision to commission the plant was finalised at 5:47 a.m. on 14 May 2025, with commercial operations commencing from 15 May 2025. ..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement