亚博体育官网首页

JREDA Announces Tender for 2 MW Canal-Top Solar Plant in Ranchi
POWER & RENEWABLE ENERGY

JREDA Announces Tender for 2 MW Canal-Top Solar Plant in Ranchi

The state of Jharkhand's JREDA has issued a call for proposals for a 2 MW grid-connected canal top solar power plant using PV technology at Sikdiri Canal, Ranchi.

The online bid must be submitted by October 6, 2012, at 5 p.m. At 3 p.m. on October 10, 2022, bids will be opened.

The scope of work for this JREDA 2 MW solar tender covers design and engineering, manufacture/procurement, supply, installation, testing, and commissioning, as well as the warranty obligation with ten years of thorough operation and maintenance.

Each interested bidder will be required to submit a 25000 non-refundable tender fee. An earnest money deposit of Rs 39,000,000 would be required from each interested bidder. After the letter of intent's validity term of 24 months from the date of issuance, the chosen bidder will be required to provide 10% of the EPC contract's total cost within 15 days. A bank guarantee for the PV module's (DC Capacity) performance, good for 25 years from the beginning of the O& M term, must also be provided by the winning bidder at a rate of Rs. 10 Lacs per MW.

Bidders must be one of the following in order to participate in the bidding process, and they must have conducted similar work within the past seven years as of the last day of the month before applications are being accepted.

Three similar completed works costing not less than the amount equivalent to 40% of the anticipated cost.

Or

Two comparable finished projects that cost at least 50% of the anticipated price.

Or

A comparable finished project that cost at least 80% of the budgeted price.

The bidder's average annual turnover for the last three fiscal years ending in 2020-2021 must be at least 30% of the estimated cost. The bidder's net worth during the previous fiscal year must be positive, and the net worth must be calculated as follows:

Net worth = (Equity + Reserves)- (Revaluation reserves intangible assets + miscellaneous expenses to the extent not written off + carries forward losses) The bidder must submit a copy of each audited annual report in order to determine their turnover and net worth.

Jharkhand Renewable Energy Development Agency (JREDA) recently extended the deadline and time for submitting and opening bids for 18 MW grid-connected solar power plants in Giridih, Jharkhand.

See also:
JREDA extends deadline for solar project at Giridih
Jharkhand鈥檚 1st canal-top solar plant to be operational by Jan 2022


The state of Jharkhand's JREDA has issued a call for proposals for a 2 MW grid-connected canal top solar power plant using PV technology at Sikdiri Canal, Ranchi. The online bid must be submitted by October 6, 2012, at 5 p.m. At 3 p.m. on October 10, 2022, bids will be opened. The scope of work for this JREDA 2 MW solar tender covers design and engineering, manufacture/procurement, supply, installation, testing, and commissioning, as well as the warranty obligation with ten years of thorough operation and maintenance. Each interested bidder will be required to submit a 25000 non-refundable tender fee. An earnest money deposit of Rs 39,000,000 would be required from each interested bidder. After the letter of intent's validity term of 24 months from the date of issuance, the chosen bidder will be required to provide 10% of the EPC contract's total cost within 15 days. A bank guarantee for the PV module's (DC Capacity) performance, good for 25 years from the beginning of the O& M term, must also be provided by the winning bidder at a rate of Rs. 10 Lacs per MW. Bidders must be one of the following in order to participate in the bidding process, and they must have conducted similar work within the past seven years as of the last day of the month before applications are being accepted. Three similar completed works costing not less than the amount equivalent to 40% of the anticipated cost. Or Two comparable finished projects that cost at least 50% of the anticipated price. Or A comparable finished project that cost at least 80% of the budgeted price. The bidder's average annual turnover for the last three fiscal years ending in 2020-2021 must be at least 30% of the estimated cost. The bidder's net worth during the previous fiscal year must be positive, and the net worth must be calculated as follows: Net worth = (Equity + Reserves)- (Revaluation reserves intangible assets + miscellaneous expenses to the extent not written off + carries forward losses) The bidder must submit a copy of each audited annual report in order to determine their turnover and net worth. Jharkhand Renewable Energy Development Agency (JREDA) recently extended the deadline and time for submitting and opening bids for 18 MW grid-connected solar power plants in Giridih, Jharkhand. See also: JREDA extends deadline for solar project at Giridih Jharkhand鈥檚 1st canal-top solar plant to be operational by Jan 2022

Next Story
Resources

Blum India brings Design Reverie to Hyderabad

Blum India hosted the Hyderabad edition of its signature event, Design Reverie, at the historic Taj Falaknuma Palace, making it a memorable evening for the city鈥檚 architecture and interior design community. As per news reports, the event combined modern design sensibilities with the grandeur of a palace setting and the spiritual charm of Sufi qawwali.This marked the third edition of the event, after previous gatherings in Delhi and Bangalore. In Hyderabad, the focus was on fostering relaxed yet meaningful dialogue among design professionals鈥攁way from the typical conference setup. The eveni..

Next Story
Resources

Hafele launches Platinum Studio in Nagpur

Hafele has expanded its franchise footprint in central India by opening a new Studio Partner Platinum showroom in Nagpur in collaboration with Onkar Furnitech. The studio was inaugurated by Nitin Gadkari, Minister of Road Transport and Highways, along with Padma Gupta, Director 鈥� HR & Customer Experience, Hafele South Asia.Located at Sarthak Plaza, South Ambazari Road, Laxmi Nagar, the showroom offers an immersive experience of Hafele鈥檚 wide-ranging interior and home solutions. Designed as a hands-on, real-life application space, the studio showcases Hafele鈥檚 full portfolio鈥攊ncludi..

Next Story
Resources

Truflo by Hindware wins GPTW honour again

Truflo by Hindware has been certified a Great Place to Work for the fourth consecutive year, reaffirming its commitment to a people-first culture. The certification was awarded by the Great Place to Work Institute following a rigorous evaluation of employee experience, leadership, culture, and HR practices.Known as India鈥檚 fastest-growing plastic pipes and fittings company, Truflo has focused on fostering an inclusive, innovative, and growth-driven work environment. The company prioritises employee well-being and professional development, creating a culture where people feel valued and empow..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement