亚博体育官网首页

Delhi Transfers Rohtak Road Redevelopment to NHAI for Faster Execution
ROADS & HIGHWAYS

Delhi Transfers Rohtak Road Redevelopment to NHAI for Faster Execution

The Delhi government has handed over the redevelopment of Rohtak Road to the National Highways Authority of India (NHAI), shifting the project from the Public Works Department (PWD) to ensure faster completion. The decision follows numerous complaints from residents about the deteriorated condition of the road, which serves as a key link between Outer North Delhi and Haryana. 

Delhi PWD Minister Parvesh Verma, after inspecting the stretch, stated that waterlogging caused by sewer overflow has severely damaged the road, leading to large potholes and traffic disruptions. The 18-kilometer stretch from Peeragarhi Chowk to Tikri Border will undergo a Rs 1.15 billion redevelopment, including improved drainage, with a targeted completion timeline of 14 months. 

Given that the project passes through areas with Indraprastha Gas Limited (IGL) pipelines and three Delhi Metro stations, necessary permissions will be obtained to prevent delays. Verma urged officials to expedite approvals, stressing that delays lead to cost escalations. He also criticised previous administrations for neglecting the road鈥檚 maintenance, leading to its current state. 

(thestatesman)    

The Delhi government has handed over the redevelopment of Rohtak Road to the National Highways Authority of India (NHAI), shifting the project from the Public Works Department (PWD) to ensure faster completion. The decision follows numerous complaints from residents about the deteriorated condition of the road, which serves as a key link between Outer North Delhi and Haryana. Delhi PWD Minister Parvesh Verma, after inspecting the stretch, stated that waterlogging caused by sewer overflow has severely damaged the road, leading to large potholes and traffic disruptions. The 18-kilometer stretch from Peeragarhi Chowk to Tikri Border will undergo a Rs 1.15 billion redevelopment, including improved drainage, with a targeted completion timeline of 14 months. Given that the project passes through areas with Indraprastha Gas Limited (IGL) pipelines and three Delhi Metro stations, necessary permissions will be obtained to prevent delays. Verma urged officials to expedite approvals, stressing that delays lead to cost escalations. He also criticised previous administrations for neglecting the road鈥檚 maintenance, leading to its current state. (thestatesman)    

Next Story
Infrastructure Urban

Silawat Launches Projects Worth Rs 120 Million in Sanwer

Water Resources Minister Tulsi Ram Silawat inaugurated and laid foundation stones for over 100 infrastructure projects valued at more than Rs 120 million during a large-scale public event in Sanwer on Sunday.Addressing the gathering, Silawat emphasised the rapid development seen in Sanwer over the past six years. 鈥淒evelopment works worth several crores have been completed across all 15 wards,鈥� he noted. The projects cover a wide range of civic improvements including cement concrete roads, drainage systems, stormwater lines, bridges, anganwadi centres, community halls, cremation grounds, pl..

Next Story
Infrastructure Urban

JSW Trust Sells Rs 12.1 Billion Stake to Aid Akzo Deal

The Sajjan Jindal Family Trust has divested a 2 per cent stake in JSW Infrastructure Ltd 鈥� India鈥檚 second-largest commercial port operator 鈥� for Rs 12.1 billion, selling shares to institutional investors including the Government of Singapore. The move is part of efforts to comply with public shareholding norms and potentially fund JSW Group鈥檚 planned acquisition of Akzo Nobel India.Of the total divestment, 0.88 per cent was offloaded directly to Singapore鈥檚 sovereign entity, which acquired approximately 18.4 million shares via block deals at Rs 288 each, amounting to Rs 5.31 billion,..

Next Story
Infrastructure Transport

Maharashtra Approves Shipbuilding Policy to Boost Maritime Sector

The Maharashtra government has approved a new shipbuilding policy to bolster the state鈥檚 maritime infrastructure and promote ship repair and recycling industries. The Maharashtra Shipbuilding, Ship Repair, and Ship Recycling Facility Development Policy 2025 was cleared in the latest cabinet meeting, with a Government Resolution (GR) issued on Friday.This move is expected to attract fresh investments, generate employment, and contribute to foreign exchange savings by reducing reliance on overseas shipyards. The policy aligns with the central government鈥檚 Maritime India Vision 2030 and Marit..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement