亚博体育官网首页

Mumbai Coastal Road project likely to be ready by November 2023
ROADS & HIGHWAYS

Mumbai Coastal Road project likely to be ready by November 2023

According to the Brihanmumbai Municipal Corporation (BMC), the construction of the 10.58 km Mumbai Coastal Road project is likely to be completed by November 2023.

After completion, it will add an 8.5 km long and 20 m wide sea promenade in Mumbai between Priyadarshini Park at Napean Sea Road and the Worli side of the Bandra Worli Sea Link.

Chandradhar Kandalkar, in charge of the project, said that more than 50% of the project work is completed, and construction work is on track.

According to the officials, Sea Promenade will include a butterfly garden and a biodiversity park to the city, and underground parking with 1,864 vehicles accommodating capacity.

From the reclaimed space of 111 hectares, 70 hectares or 63.6% will be used for developing recreation spaces and amenities. About 26.5 hectares or 23.88% will be used for constructing interchanges, and 14.5 hectares or 13.6% will be used to construct a sea wall to protect the area from sea waves.

Currently, Marine Drive is the longest sea promenade of 3.5 km. The sea promenade created as part of the Coastal Road project will be more than double this length and a width of 20 m. Indigenous trees are to be planted along the walkway to attract tourists. Other amenities include cycle tracks, open theatres, parks and playgrounds, and public toilets.

As part of the project, Monopile technology will be used instead of multiple foundations for constructing the bridge and the Coastal Road. According to the officials, this technology will be used for the first time in India. Around 176 single pillars are being constructed using monopile technology, where a single column runs from the bottom to the top of the pillar.


Also read: BMC completes 2 km tunnel works of Mumbai coastal road project

According to the Brihanmumbai Municipal Corporation (BMC), the construction of the 10.58 km Mumbai Coastal Road project is likely to be completed by November 2023. After completion, it will add an 8.5 km long and 20 m wide sea promenade in Mumbai between Priyadarshini Park at Napean Sea Road and the Worli side of the Bandra Worli Sea Link. Chandradhar Kandalkar, in charge of the project, said that more than 50% of the project work is completed, and construction work is on track. According to the officials, Sea Promenade will include a butterfly garden and a biodiversity park to the city, and underground parking with 1,864 vehicles accommodating capacity. From the reclaimed space of 111 hectares, 70 hectares or 63.6% will be used for developing recreation spaces and amenities. About 26.5 hectares or 23.88% will be used for constructing interchanges, and 14.5 hectares or 13.6% will be used to construct a sea wall to protect the area from sea waves. Currently, Marine Drive is the longest sea promenade of 3.5 km. The sea promenade created as part of the Coastal Road project will be more than double this length and a width of 20 m. Indigenous trees are to be planted along the walkway to attract tourists. Other amenities include cycle tracks, open theatres, parks and playgrounds, and public toilets. As part of the project, Monopile technology will be used instead of multiple foundations for constructing the bridge and the Coastal Road. According to the officials, this technology will be used for the first time in India. Around 176 single pillars are being constructed using monopile technology, where a single column runs from the bottom to the top of the pillar. Image Source Also read: BMC completes 2 km tunnel works of Mumbai coastal road project

Next Story
Resources

Hafele launches Platinum Studio in Nagpur

Hafele has expanded its franchise footprint in central India by opening a new Studio Partner Platinum showroom in Nagpur in collaboration with Onkar Furnitech. The studio was inaugurated by Nitin Gadkari, Minister of Road Transport and Highways, along with Padma Gupta, Director 鈥� HR & Customer Experience, Hafele South Asia.Located at Sarthak Plaza, South Ambazari Road, Laxmi Nagar, the showroom offers an immersive experience of Hafele鈥檚 wide-ranging interior and home solutions. Designed as a hands-on, real-life application space, the studio showcases Hafele鈥檚 full portfolio鈥攊ncludi..

Next Story
Resources

Truflo by Hindware wins GPTW honour again

Truflo by Hindware has been certified a Great Place to Work for the fourth consecutive year, reaffirming its commitment to a people-first culture. The certification was awarded by the Great Place to Work Institute following a rigorous evaluation of employee experience, leadership, culture, and HR practices.Known as India鈥檚 fastest-growing plastic pipes and fittings company, Truflo has focused on fostering an inclusive, innovative, and growth-driven work environment. The company prioritises employee well-being and professional development, creating a culture where people feel valued and empow..

Next Story
Infrastructure Transport

Ahmedabad鈥檚 Rs 1.17 Billion Flyover Opens

A major infrastructure milestone was achieved in Ahmedabad with the inauguration of a new Rs 1.17-billion flyover at Pallav Char Rasta on May 18.Union 亚博体育官网首页 and Cooperation Minister Amit Shah, who represents the Gandhinagar Lok Sabha constituency, unveiled the structure that was expected to ease vehicular congestion for nearly 1.5 lakh daily commuters navigating through the city鈥檚 busy Naranpura zone. The flyover, constructed across the 132-feet Ring Road, extended 935 metres in length and spanned 8.4 metres in width. It reached a height of 5.37 metres at the Pragatinagar junction and feature..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement