亚博体育官网首页

Schaeffler India posts higher quarterly, lower yearly profits
Company News

Schaeffler India posts higher quarterly, lower yearly profits

Schaeffler India Limited, industrial and automotive supplier company, announced the results for the fourth quarter and full year, ended 31 December 2020.

October鈥揇ecember 2020 (Q4)

  • Total revenue from operations (net) for the quarter (Q4) was Rs 12,738 million, higher by 13.7% than the preceding quarter and 22.9% higher than the corresponding quarter of 2019.
  • Profit before tax (PBT) (before exceptional items) for the quarter (Q4) was Rs 1,911 million, higher by 25.1% than the preceding quarter and 53.9% higher than the corresponding quarter of 2019.
  • Net profit margin for the quarter stood at 11.1%.

January鈥揇ecember 2020 (12 months)

  • Total revenue from operations (net) for the 12 months period was Rs 37,619 million, lower by 13.7% than the corresponding period of 2019.
  • PBT (before exceptional items) for the period was Rs 3,972 million, lower by 25.7%.
  • Net profit margin for the year stood at 7.7%.

produces ball bearings, cylindrical roller bearings, spherical roller bearings and wheel bearings that are sold under the brand name of FAG.

Written from a company news release.

: Although 2020 results were lower than 2019, the company鈥檚 Q4 results show a positive trajectory.



Schaeffler India Limited, industrial and automotive supplier company, announced the results for the fourth quarter and full year, ended 31 December 2020. October鈥揇ecember 2020 (Q4) Total revenue from operations (net) for the quarter (Q4) was Rs 12,738 million, higher by 13.7% than the preceding quarter and 22.9% higher than the corresponding quarter of 2019. Profit before tax (PBT) (before exceptional items) for the quarter (Q4) was Rs 1,911 million, higher by 25.1% than the preceding quarter and 53.9% higher than the corresponding quarter of 2019. Net profit margin for the quarter stood at 11.1%. January鈥揇ecember 2020 (12 months) Total revenue from operations (net) for the 12 months period was Rs 37,619 million, lower by 13.7% than the corresponding period of 2019. PBT (before exceptional items) for the period was Rs 3,972 million, lower by 25.7%. Net profit margin for the year stood at 7.7%. Schaeffler produces ball bearings, cylindrical roller bearings, spherical roller bearings and wheel bearings that are sold under the brand name of FAG. Written from a company news release.Image: Although 2020 results were lower than 2019, the company鈥檚 Q4 results show a positive trajectory.

Next Story
Infrastructure Transport

New Expressway to Cut Pune-Bengaluru Travel Time by Half

The upcoming Pune-Bengaluru Expressway is expected to significantly improve connectivity and economic opportunities across Maharashtra and Karnataka. This 700-kilometre greenfield, access-controlled highway will cut the travel time between Pune and Bengaluru from 15 hours to just 7 hours, facilitating easier movement for both commuters and businesses. Starting from Bommanal in Karnataka鈥檚 Athani Taluk, the expressway will traverse important districts such as Belagavi, Bagalkot, and Jamakhandi. It will then enter Maharashtra at Kanjle, connect with the proposed Pune Ring Road, and pass throug..

Next Story
Infrastructure Transport

Nagpur鈥檚 Koradi Naka to Get Y-Shaped Flyover for Safer, Smoother Traffic

To alleviate traffic congestion and enhance safety at Koradi Naka in Nagpur, a Y-shaped flyover is currently being constructed on National Highway 47. Demolition work has already commenced, with the main construction scheduled to start on June 20, 2025.The project, costing Rs 430.37 billion, involves building a 1,090-meter-long flyover that will connect Farsa, the Mahadula Railway Overbridge (ROB), and Bokhara Road, and will also feature an underpass. The existing structure will be repurposed into a service road to facilitate local traffic.Koradi Naka has been identified as a significant "blac..

Next Story
Infrastructure Transport

Avinashi Flyover: Huge Iron Span to be Placed Over Railway Overbridge

A senior official from the Special Project Wing explained that a concrete deck of such length was not practical across active railway lines. Therefore, the department had decided to opt for a specially fabricated iron span.With the span now ready, its installation is awaiting railway clearance. The Salem Division of Southern Railway has already given its approval, while the final clearance is still pending from the Southern Railway headquarters in Chennai. For the installation process, railway operations under the ROB will need to be suspended for at least five days.The official also mentioned..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement