亚博体育官网首页

 Govt issues draft notification for fuel-efficient, safer tyres in India
ROADS & HIGHWAYS

Govt issues draft notification for fuel-efficient, safer tyres in India

The Ministry of Road Transport and Highways (MoRTH) has issued draft rules which state that the tyres of cars, buses, and trucks should meet the needs of wet grip and rolling sound emissions.

It announced this policy for new model tyres from October 1, 2021, and for the existing models from October 1, 2022.

MoRTH said in a series of tweets that it issued a draft announcing that the tyres of cars, buses, and trucks should meet the requirements, as specified in Stage-II of the Automotive Industry Standards (AIS) 142:2019, amended from time to time.

As per the ministry, the rolling resistance of tyres influences fuel efficiency, while the braking performance is related to the wet grip of the tyres under slippery conditions.

MoRTH added that the rolling sound emission is related to the sound transmitted from the connection among the tyres in movement and the road surface.

The ministry told the media that the standard should align the tyre performance about their sound emissions, rolling resistance and adhesion performance on wet surfaces with the Stage-II limits of European regulations. It will even allow the user to make an informed choice.

MoRTH further added that these norms are similar to the regime in Europe, issued in 2016. The objections and recommendations to these draft rules may be sent to the government.


Also read: NSV Technology: Bihar to adopt tamper-proof laser for road quality control

The Ministry of Road Transport and Highways (MoRTH) has issued draft rules which state that the tyres of cars, buses, and trucks should meet the needs of wet grip and rolling sound emissions. It announced this policy for new model tyres from October 1, 2021, and for the existing models from October 1, 2022. MoRTH said in a series of tweets that it issued a draft announcing that the tyres of cars, buses, and trucks should meet the requirements, as specified in Stage-II of the Automotive Industry Standards (AIS) 142:2019, amended from time to time. As per the ministry, the rolling resistance of tyres influences fuel efficiency, while the braking performance is related to the wet grip of the tyres under slippery conditions. MoRTH added that the rolling sound emission is related to the sound transmitted from the connection among the tyres in movement and the road surface. The ministry told the media that the standard should align the tyre performance about their sound emissions, rolling resistance and adhesion performance on wet surfaces with the Stage-II limits of European regulations. It will even allow the user to make an informed choice. MoRTH further added that these norms are similar to the regime in Europe, issued in 2016. The objections and recommendations to these draft rules may be sent to the government. Image SourceAlso read: NSV Technology: Bihar to adopt tamper-proof laser for road quality control

Next Story
Infrastructure Transport

New Expressway to Cut Pune-Bengaluru Travel Time by Half

The upcoming Pune-Bengaluru Expressway is expected to significantly improve connectivity and economic opportunities across Maharashtra and Karnataka. This 700-kilometre greenfield, access-controlled highway will cut the travel time between Pune and Bengaluru from 15 hours to just 7 hours, facilitating easier movement for both commuters and businesses. Starting from Bommanal in Karnataka鈥檚 Athani Taluk, the expressway will traverse important districts such as Belagavi, Bagalkot, and Jamakhandi. It will then enter Maharashtra at Kanjle, connect with the proposed Pune Ring Road, and pass throug..

Next Story
Infrastructure Transport

Nagpur鈥檚 Koradi Naka to Get Y-Shaped Flyover for Safer, Smoother Traffic

To alleviate traffic congestion and enhance safety at Koradi Naka in Nagpur, a Y-shaped flyover is currently being constructed on National Highway 47. Demolition work has already commenced, with the main construction scheduled to start on June 20, 2025.The project, costing Rs 430.37 billion, involves building a 1,090-meter-long flyover that will connect Farsa, the Mahadula Railway Overbridge (ROB), and Bokhara Road, and will also feature an underpass. The existing structure will be repurposed into a service road to facilitate local traffic.Koradi Naka has been identified as a significant "blac..

Next Story
Infrastructure Transport

Avinashi Flyover: Huge Iron Span to be Placed Over Railway Overbridge

A senior official from the Special Project Wing explained that a concrete deck of such length was not practical across active railway lines. Therefore, the department had decided to opt for a specially fabricated iron span.With the span now ready, its installation is awaiting railway clearance. The Salem Division of Southern Railway has already given its approval, while the final clearance is still pending from the Southern Railway headquarters in Chennai. For the installation process, railway operations under the ROB will need to be suspended for at least five days.The official also mentioned..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement