ÑDz©ÌåÓý¹ÙÍøÊ×Ò³

Access to Qutub Minar to get easier with construction of an elevated road
ROADS & HIGHWAYS

Access to Qutub Minar to get easier with construction of an elevated road

In a bid to decongest the roads near Qutub Minar, the Delhi Government is planning to construct a long elevated road that stretches across 2 km and connects Chhattarpur’s 100 feet road to the Indira Gandhi National Open University (IGNOU). 

Reportedly, the move was a result of a review meeting held earlier this month by Public Works Department Minister Satyendar Jain. 

The road will not only reduce congestion but will also help in diverting traffic going towards the monument and Gurgaon. At present, visitors have to pass through Qutub Minar and Saket metro station while travelling from Chhattarpur to IGNOU, and the other way around. Post the construction of this elevation, travellers will be able to avoid this stretch. The project is, however, only in the initial planning stages. A budget will be allocated prior to an assessment report being submitted by the panel, as reported.

Among other roadway projects in the capital, the Rao Tula Ram (RTR) flyover was also recently inaugurated. It converges out of the Munirka flyover and ends before the Army Research and Referral Hospital in Delhi, near Subroto Park that is close to NH-8.

In a bid to decongest the roads near Qutub Minar, the Delhi Government is planning to construct a long elevated road that stretches across 2 km and connects Chhattarpur’s 100 feet road to the Indira Gandhi National Open University (IGNOU). Reportedly, the move was a result of a review meeting held earlier this month by Public Works Department Minister Satyendar Jain. The road will not only reduce congestion but will also help in diverting traffic going towards the monument and Gurgaon. At present, visitors have to pass through Qutub Minar and Saket metro station while travelling from Chhattarpur to IGNOU, and the other way around. Post the construction of this elevation, travellers will be able to avoid this stretch. The project is, however, only in the initial planning stages. A budget will be allocated prior to an assessment report being submitted by the panel, as reported.Among other roadway projects in the capital, the Rao Tula Ram (RTR) flyover was also recently inaugurated. It converges out of the Munirka flyover and ends before the Army Research and Referral Hospital in Delhi, near Subroto Park that is close to NH-8.

Next Story
Real Estate

Kolkata’s luxury housing market sees price growth amid mixed trends

A new study by Nklusive reveals that Kolkata’s luxury residential market (Rs 5�10 crore) recorded a 33 per cent year-on-year rise in supply and a 52 per cent increase in sales in calendar year 2024 (CY24). South Kolkata led with 78 per cent of the segment’s supply. The average price rose by 6 per cent—from Rs 17,519 to Rs 18,600 per sq ft—while unsold inventory grew by 15 per cent. Monthly absorption improved from 2 to 3 units.In contrast, the ultra-luxury segment (Rs 10 crore and above) experienced a 17 per cent decline in supply and a 30 per cent fall in sales. Central Kolkata acco..

Next Story
Infrastructure Transport

New Expressway to Cut Pune-Bengaluru Travel Time by Half

The upcoming Pune-Bengaluru Expressway is expected to significantly improve connectivity and economic opportunities across Maharashtra and Karnataka. This 700-kilometre greenfield, access-controlled highway will cut the travel time between Pune and Bengaluru from 15 hours to just 7 hours, facilitating easier movement for both commuters and businesses. Starting from Bommanal in Karnataka’s Athani Taluk, the expressway will traverse important districts such as Belagavi, Bagalkot, and Jamakhandi. It will then enter Maharashtra at Kanjle, connect with the proposed Pune Ring Road, and pass throug..

Next Story
Infrastructure Transport

Nagpur’s Koradi Naka to Get Y-Shaped Flyover for Safer, Smoother Traffic

To alleviate traffic congestion and enhance safety at Koradi Naka in Nagpur, a Y-shaped flyover is currently being constructed on National Highway 47. Demolition work has already commenced, with the main construction scheduled to start on June 20, 2025.The project, costing Rs 430.37 billion, involves building a 1,090-meter-long flyover that will connect Farsa, the Mahadula Railway Overbridge (ROB), and Bokhara Road, and will also feature an underpass. The existing structure will be repurposed into a service road to facilitate local traffic.Koradi Naka has been identified as a significant "blac..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement