DDA, MoHUA plan Rs 5k cr funding for traffic handling
03 Mar 2021
2 Min Read
Editorial Team
The Delhi Development Authority (DDA) and the Ministry of Housing and Urban Affairs (MoHUA) are planning for funding of approximately Rs 5,000 crore for an integrated transit plan aimed at handling the expected rise in vehicular traffic around eight government colonies that the Centre is redeveloping.
The Delhi Lieutenant Governor has asked DDA to discuss funding for the project with the MoHUA before it is cleared by the Unified Traffic and Transportation Infrastructure (Planning and Engineering) Centre (UTTIPEC), the apex body for traffic and transportation projects in Delhi.
Officials told the media that the plan includes a 14 km elevated corridor from INA at Aurobindo Marg to Mahipalpur underpass at National Highway 8 and connecting all the flyovers between Moti Bagh and Moolchand, just before the start of the elevated Metro corridor on the Ring Road.
A senior DDA official said the corridor would be an alternate route to the IGI airport covering all the general pool residential accommodation (GPRA) colonies in south Delhi鈥擭auroji Nagar, Sarojini Nagar, Srinivaspuri, Kasturba Nagar, Netaji Nagar, Thyagraj Nagar and Mohammadpur.
4th Indian Cement Review Conference 2021
17-18 March
The proposal for the corridor was tabled by Delhi's Public Works Department (PWD) in the governing body of UTTIPEC in December last year. The PWD prepared a feasibility study for the corridor for approval on behalf of the National Buildings Construction Company (NBCC-India), which is involved in the redevelopment of four government colonies in south Delhi.
The government is developing over 25,000 dwelling units and a commercial complex in the seven residential colonies. NBCC India has already redeveloped East Kidwai Nagar.
NBCC-India, which is redeveloping Sarojini Nagar, Nauroji Nagar and Netaji Nagar, asked Delhi PWD in 2018 to conduct the corridor's feasibility study.
While the elevated corridor's alignment is yet to be finalised, the PWD official said the plan is to start the corridor from INA and go through Africa Avenue, Nelson Mandela Road and end at Mahipalpur underpass.
The Delhi PWD did the feasibility study, but the construction of the corridor is likely to be done by the Central Public Works Department (CPWD) as it is a central government funded project.
Also read: DDA policy for development in peripheral villages
The Delhi Development Authority (DDA) and the Ministry of Housing and Urban Affairs (MoHUA) are planning for funding of approximately Rs 5,000 crore for an integrated transit plan aimed at handling the expected rise in vehicular traffic around eight government colonies that the Centre is redeveloping.
The Delhi Lieutenant Governor has asked DDA to discuss funding for the project with the MoHUA before it is cleared by the Unified Traffic and Transportation Infrastructure (Planning and Engineering) Centre (UTTIPEC), the apex body for traffic and transportation projects in Delhi.
Officials told the media that the plan includes a 14 km elevated corridor from INA at Aurobindo Marg to Mahipalpur underpass at National Highway 8 and connecting all the flyovers between Moti Bagh and Moolchand, just before the start of the elevated Metro corridor on the Ring Road.
A senior DDA official said the corridor would be an alternate route to the IGI airport covering all the general pool residential accommodation (GPRA) colonies in south Delhi鈥擭auroji Nagar, Sarojini Nagar, Srinivaspuri, Kasturba Nagar, Netaji Nagar, Thyagraj Nagar and Mohammadpur.4th Indian Cement Review Conference 202117-18 March Click for event info
The proposal for the corridor was tabled by Delhi's Public Works Department (PWD) in the governing body of UTTIPEC in December last year. The PWD prepared a feasibility study for the corridor for approval on behalf of the National Buildings Construction Company (NBCC-India), which is involved in the redevelopment of four government colonies in south Delhi.
The government is developing over 25,000 dwelling units and a commercial complex in the seven residential colonies. NBCC India has already redeveloped East Kidwai Nagar.
NBCC-India, which is redeveloping Sarojini Nagar, Nauroji Nagar and Netaji Nagar, asked Delhi PWD in 2018 to conduct the corridor's feasibility study.
While the elevated corridor's alignment is yet to be finalised, the PWD official said the plan is to start the corridor from INA and go through Africa Avenue, Nelson Mandela Road and end at Mahipalpur underpass.
The Delhi PWD did the feasibility study, but the construction of the corridor is likely to be done by the Central Public Works Department (CPWD) as it is a central government funded project.
Image Source
Also read: DDA policy for development in peripheral villages
Next Story
New Expressway to Cut Pune-Bengaluru Travel Time by Half
The upcoming Pune-Bengaluru Expressway is expected to significantly improve connectivity and economic opportunities across Maharashtra and Karnataka. This 700-kilometre greenfield, access-controlled highway will cut the travel time between Pune and Bengaluru from 15 hours to just 7 hours, facilitating easier movement for both commuters and businesses. Starting from Bommanal in Karnataka鈥檚 Athani Taluk, the expressway will traverse important districts such as Belagavi, Bagalkot, and Jamakhandi. It will then enter Maharashtra at Kanjle, connect with the proposed Pune Ring Road, and pass throug..
Next Story
Nagpur鈥檚 Koradi Naka to Get Y-Shaped Flyover for Safer, Smoother Traffic
To alleviate traffic congestion and enhance safety at Koradi Naka in Nagpur, a Y-shaped flyover is currently being constructed on National Highway 47. Demolition work has already commenced, with the main construction scheduled to start on June 20, 2025.The project, costing Rs 430.37 billion, involves building a 1,090-meter-long flyover that will connect Farsa, the Mahadula Railway Overbridge (ROB), and Bokhara Road, and will also feature an underpass. The existing structure will be repurposed into a service road to facilitate local traffic.Koradi Naka has been identified as a significant "blac..
Next Story
Avinashi Flyover: Huge Iron Span to be Placed Over Railway Overbridge
A senior official from the Special Project Wing explained that a concrete deck of such length was not practical across active railway lines. Therefore, the department had decided to opt for a specially fabricated iron span.With the span now ready, its installation is awaiting railway clearance. The Salem Division of Southern Railway has already given its approval, while the final clearance is still pending from the Southern Railway headquarters in Chennai. For the installation process, railway operations under the ROB will need to be suspended for at least five days.The official also mentioned..