High-rise plans scrutinised for twin coastal road tunnels
07 Dec 2023
2 Min Read
CW Team
Two prime development projects on Little Gibbs Road at Malabar Hill, which were planned to be constructed above the twin coastal road tunnels, are currently under scrutiny for safety measures. This evaluation follows a tunnel collapse at Silkyara, during which 41 miners were trapped for 17 days. The coastal road department of the Brihanmumbai Municipal Corporation (BMC) has requested the building proposals department to assess the safety of two high-rise projects, each with 3-4 storeys of basement.
A letter requesting a safety review has been dispatched to Aakar Architects and Consultants and Barai Architects. These two firms play the role of 'liaisoning consultants in simplifying approvals for real estate projects.'
A no-objection certificate (NOC) had been granted by the coastal road department to Aakar Architects and Consultants on June 15, 2022, for an 18-storey building with a 4-level basement. Similarly, Barai Architects received an NOC on November 2, 2018, for a 32-meter high, 7-floor building with 3 levels of basement. The redevelopment is taking place on plots where two bungalows once stood. One plot is owned by Reliance, and the other is owned by Godrej and Boyce.
The BMC's action was prompted by a complaint from citizen-activist Santosh Daundkar. He asserted, "Malabar Hill is an original tekdi (hillock). Originally, the British had built on it, but over the decades, due to development work and environmental changes, the tekdi is becoming weaker." He added, "The coastal road is Mumbai?s dream project. The two projects are being constructed over the tunnel. Heavy loads and even more digging could endanger the tunnel, and that is why I have filed a complaint."
Two prime development projects on Little Gibbs Road at Malabar Hill, which were planned to be constructed above the twin coastal road tunnels, are currently under scrutiny for safety measures. This evaluation follows a tunnel collapse at Silkyara, during which 41 miners were trapped for 17 days. The coastal road department of the Brihanmumbai Municipal Corporation (BMC) has requested the building proposals department to assess the safety of two high-rise projects, each with 3-4 storeys of basement.
A letter requesting a safety review has been dispatched to Aakar Architects and Consultants and Barai Architects. These two firms play the role of 'liaisoning consultants in simplifying approvals for real estate projects.'
A no-objection certificate (NOC) had been granted by the coastal road department to Aakar Architects and Consultants on June 15, 2022, for an 18-storey building with a 4-level basement. Similarly, Barai Architects received an NOC on November 2, 2018, for a 32-meter high, 7-floor building with 3 levels of basement. The redevelopment is taking place on plots where two bungalows once stood. One plot is owned by Reliance, and the other is owned by Godrej and Boyce.
The BMC's action was prompted by a complaint from citizen-activist Santosh Daundkar. He asserted, Malabar Hill is an original tekdi (hillock). Originally, the British had built on it, but over the decades, due to development work and environmental changes, the tekdi is becoming weaker. He added, The coastal road is Mumbai?s dream project. The two projects are being constructed over the tunnel. Heavy loads and even more digging could endanger the tunnel, and that is why I have filed a complaint.
Next Story
Kolkata鈥檚 luxury housing market sees price growth amid mixed trends
A new study by Nklusive reveals that Kolkata鈥檚 luxury residential market (Rs 5鈥�10 crore) recorded a 33 per cent year-on-year rise in supply and a 52 per cent increase in sales in calendar year 2024 (CY24). South Kolkata led with 78 per cent of the segment鈥檚 supply. The average price rose by 6 per cent鈥攆rom Rs 17,519 to Rs 18,600 per sq ft鈥攚hile unsold inventory grew by 15 per cent. Monthly absorption improved from 2 to 3 units.In contrast, the ultra-luxury segment (Rs 10 crore and above) experienced a 17 per cent decline in supply and a 30 per cent fall in sales. Central Kolkata acco..
Next Story
New Expressway to Cut Pune-Bengaluru Travel Time by Half
The upcoming Pune-Bengaluru Expressway is expected to significantly improve connectivity and economic opportunities across Maharashtra and Karnataka. This 700-kilometre greenfield, access-controlled highway will cut the travel time between Pune and Bengaluru from 15 hours to just 7 hours, facilitating easier movement for both commuters and businesses. Starting from Bommanal in Karnataka鈥檚 Athani Taluk, the expressway will traverse important districts such as Belagavi, Bagalkot, and Jamakhandi. It will then enter Maharashtra at Kanjle, connect with the proposed Pune Ring Road, and pass throug..
Next Story
Nagpur鈥檚 Koradi Naka to Get Y-Shaped Flyover for Safer, Smoother Traffic
To alleviate traffic congestion and enhance safety at Koradi Naka in Nagpur, a Y-shaped flyover is currently being constructed on National Highway 47. Demolition work has already commenced, with the main construction scheduled to start on June 20, 2025.The project, costing Rs 430.37 billion, involves building a 1,090-meter-long flyover that will connect Farsa, the Mahadula Railway Overbridge (ROB), and Bokhara Road, and will also feature an underpass. The existing structure will be repurposed into a service road to facilitate local traffic.Koradi Naka has been identified as a significant "blac..