亚博体育官网首页

Kerala Infra Fund Board approves Rs 2,134.5 cr for tunnel project
ROADS & HIGHWAYS

Kerala Infra Fund Board approves Rs 2,134.5 cr for tunnel project

Kerala Infrastructure Investment Fund Board (KIIFB) has approved the allotment of Rs 2,134.5 crore for the tunnel road project, an alternative to the busy Thamarassery Ghat Pass that would link Kozhikode and Wayanad districts.

Linto Joseph, Thiruvambadi MLA, told the media that the state government provided the administrative sanction for Rs 658 crore for the proposed road on the Anakkampoyil-Kalladi-Meppadi route.

Subsequently, according to the Detailed Project Report (DPR), drafted by the Konkan Railway Corporation Limited (KRCL), the cost was estimated to be Rs 2,134 crore.

After getting permission from the Ministry of Environment, Forest and Climate Change (MoEFCC) and administrative sanction from the government, construction would start.

The District Collectors of Kozhikode and Wayanad are directed to acquire land for the proposed road.

The project would not only help the districts of Kozhikode and Wayanad but also the Kannur and Malappuram ones.

The distance from Kozhikode to Wayanad would be decreased to 54 km from the existing 85 km.


Also read: Survey works for Kerala's longest tunnel road

Kerala Infrastructure Investment Fund Board (KIIFB) has approved the allotment of Rs 2,134.5 crore for the tunnel road project, an alternative to the busy Thamarassery Ghat Pass that would link Kozhikode and Wayanad districts. Linto Joseph, Thiruvambadi MLA, told the media that the state government provided the administrative sanction for Rs 658 crore for the proposed road on the Anakkampoyil-Kalladi-Meppadi route. Subsequently, according to the Detailed Project Report (DPR), drafted by the Konkan Railway Corporation Limited (KRCL), the cost was estimated to be Rs 2,134 crore. After getting permission from the Ministry of Environment, Forest and Climate Change (MoEFCC) and administrative sanction from the government, construction would start. The District Collectors of Kozhikode and Wayanad are directed to acquire land for the proposed road. The project would not only help the districts of Kozhikode and Wayanad but also the Kannur and Malappuram ones. The distance from Kozhikode to Wayanad would be decreased to 54 km from the existing 85 km. Image Source Also read: Survey works for Kerala's longest tunnel road

Next Story
Real Estate

Kolkata鈥檚 luxury housing market sees price growth amid mixed trends

A new study by Nklusive reveals that Kolkata鈥檚 luxury residential market (Rs 5鈥�10 crore) recorded a 33 per cent year-on-year rise in supply and a 52 per cent increase in sales in calendar year 2024 (CY24). South Kolkata led with 78 per cent of the segment鈥檚 supply. The average price rose by 6 per cent鈥攆rom Rs 17,519 to Rs 18,600 per sq ft鈥攚hile unsold inventory grew by 15 per cent. Monthly absorption improved from 2 to 3 units.In contrast, the ultra-luxury segment (Rs 10 crore and above) experienced a 17 per cent decline in supply and a 30 per cent fall in sales. Central Kolkata acco..

Next Story
Infrastructure Transport

New Expressway to Cut Pune-Bengaluru Travel Time by Half

The upcoming Pune-Bengaluru Expressway is expected to significantly improve connectivity and economic opportunities across Maharashtra and Karnataka. This 700-kilometre greenfield, access-controlled highway will cut the travel time between Pune and Bengaluru from 15 hours to just 7 hours, facilitating easier movement for both commuters and businesses. Starting from Bommanal in Karnataka鈥檚 Athani Taluk, the expressway will traverse important districts such as Belagavi, Bagalkot, and Jamakhandi. It will then enter Maharashtra at Kanjle, connect with the proposed Pune Ring Road, and pass throug..

Next Story
Infrastructure Transport

Nagpur鈥檚 Koradi Naka to Get Y-Shaped Flyover for Safer, Smoother Traffic

To alleviate traffic congestion and enhance safety at Koradi Naka in Nagpur, a Y-shaped flyover is currently being constructed on National Highway 47. Demolition work has already commenced, with the main construction scheduled to start on June 20, 2025.The project, costing Rs 430.37 billion, involves building a 1,090-meter-long flyover that will connect Farsa, the Mahadula Railway Overbridge (ROB), and Bokhara Road, and will also feature an underpass. The existing structure will be repurposed into a service road to facilitate local traffic.Koradi Naka has been identified as a significant "blac..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement