亚博体育官网首页

Panaji MLA Assures Road Repairs Post-Monsoon
ROADS & HIGHWAYS

Panaji MLA Assures Road Repairs Post-Monsoon

Panaji MLA Atanasio ?Babush? Monserrate attributed the current condition of Panaji's roads to heavy rainfall on Monday. He stated that the heavy rains were solely responsible for the state of the roads, and that this period would serve as a test to identify the issues related to the Smart City projects. Monserrate emphasised that any problems would need to be assessed and addressed after the monsoon season.

Monserrate indicated that rectifications would be made post-monsoon, as assessing the situation during the heavy rains was not feasible. He noted that patchwork repairs were not a viable solution, as merely placing rubble would be temporary and would eventually deteriorate. The MLA stressed that the tender for the Smart City project specified the required quality of work, and that a thorough assessment would be necessary. He pointed out that the consultant who approved the final work was responsible for ensuring the quality of the project.

Monserrate reiterated that the real evaluation of what went wrong would take place after the monsoon, and that the consultant's role in the project would be scrutinized to ensure that the quality standards mentioned in the tender were met.

Panaji MLA Atanasio ?Babush? Monserrate attributed the current condition of Panaji's roads to heavy rainfall on Monday. He stated that the heavy rains were solely responsible for the state of the roads, and that this period would serve as a test to identify the issues related to the Smart City projects. Monserrate emphasised that any problems would need to be assessed and addressed after the monsoon season. Monserrate indicated that rectifications would be made post-monsoon, as assessing the situation during the heavy rains was not feasible. He noted that patchwork repairs were not a viable solution, as merely placing rubble would be temporary and would eventually deteriorate. The MLA stressed that the tender for the Smart City project specified the required quality of work, and that a thorough assessment would be necessary. He pointed out that the consultant who approved the final work was responsible for ensuring the quality of the project. Monserrate reiterated that the real evaluation of what went wrong would take place after the monsoon, and that the consultant's role in the project would be scrutinized to ensure that the quality standards mentioned in the tender were met.

Next Story
Real Estate

Kolkata鈥檚 luxury housing market sees price growth amid mixed trends

A new study by Nklusive reveals that Kolkata鈥檚 luxury residential market (Rs 5鈥�10 crore) recorded a 33 per cent year-on-year rise in supply and a 52 per cent increase in sales in calendar year 2024 (CY24). South Kolkata led with 78 per cent of the segment鈥檚 supply. The average price rose by 6 per cent鈥攆rom Rs 17,519 to Rs 18,600 per sq ft鈥攚hile unsold inventory grew by 15 per cent. Monthly absorption improved from 2 to 3 units.In contrast, the ultra-luxury segment (Rs 10 crore and above) experienced a 17 per cent decline in supply and a 30 per cent fall in sales. Central Kolkata acco..

Next Story
Infrastructure Transport

New Expressway to Cut Pune-Bengaluru Travel Time by Half

The upcoming Pune-Bengaluru Expressway is expected to significantly improve connectivity and economic opportunities across Maharashtra and Karnataka. This 700-kilometre greenfield, access-controlled highway will cut the travel time between Pune and Bengaluru from 15 hours to just 7 hours, facilitating easier movement for both commuters and businesses. Starting from Bommanal in Karnataka鈥檚 Athani Taluk, the expressway will traverse important districts such as Belagavi, Bagalkot, and Jamakhandi. It will then enter Maharashtra at Kanjle, connect with the proposed Pune Ring Road, and pass throug..

Next Story
Infrastructure Transport

Nagpur鈥檚 Koradi Naka to Get Y-Shaped Flyover for Safer, Smoother Traffic

To alleviate traffic congestion and enhance safety at Koradi Naka in Nagpur, a Y-shaped flyover is currently being constructed on National Highway 47. Demolition work has already commenced, with the main construction scheduled to start on June 20, 2025.The project, costing Rs 430.37 billion, involves building a 1,090-meter-long flyover that will connect Farsa, the Mahadula Railway Overbridge (ROB), and Bokhara Road, and will also feature an underpass. The existing structure will be repurposed into a service road to facilitate local traffic.Koradi Naka has been identified as a significant "blac..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement