亚博体育官网首页

Tiruvallur bridge reconstruction resumes
ROADS & HIGHWAYS

Tiruvallur bridge reconstruction resumes

After a decade-long hiatus, construction has recommenced on the Tiruvallur bridge, bringing relief to residents and commuters. The infrastructure project, stalled for ten years, is a crucial development for the region.

The Tiruvallur bridge, a key component of the city's transportation network, had faced numerous setbacks leading to the prolonged delay. However, with renewed commitment and resources, the construction has finally gained momentum.

Local authorities have expressed optimism regarding the positive impact on transportation efficiency and safety once the bridge is completed. The prolonged delay had caused inconvenience to the community, and the resumption of work is welcomed as a positive step toward addressing these concerns.

The project's restart is attributed to collaborative efforts between government bodies, contractors, and stakeholders. This revitalisation aligns with the broader objective of enhancing urban infrastructure and connectivity in the Chennai metropolitan area.

While challenges and delays are common in large-scale projects, the Tiruvallur bridge's resumption signals a commitment to addressing critical infrastructure needs. The community can now look forward to the completion of the long-awaited project, which promises to alleviate congestion and enhance overall connectivity in the region.

After a decade-long hiatus, construction has recommenced on the Tiruvallur bridge, bringing relief to residents and commuters. The infrastructure project, stalled for ten years, is a crucial development for the region. The Tiruvallur bridge, a key component of the city's transportation network, had faced numerous setbacks leading to the prolonged delay. However, with renewed commitment and resources, the construction has finally gained momentum. Local authorities have expressed optimism regarding the positive impact on transportation efficiency and safety once the bridge is completed. The prolonged delay had caused inconvenience to the community, and the resumption of work is welcomed as a positive step toward addressing these concerns. The project's restart is attributed to collaborative efforts between government bodies, contractors, and stakeholders. This revitalisation aligns with the broader objective of enhancing urban infrastructure and connectivity in the Chennai metropolitan area. While challenges and delays are common in large-scale projects, the Tiruvallur bridge's resumption signals a commitment to addressing critical infrastructure needs. The community can now look forward to the completion of the long-awaited project, which promises to alleviate congestion and enhance overall connectivity in the region.

Next Story
Real Estate

Kolkata鈥檚 luxury housing market sees price growth amid mixed trends

A new study by Nklusive reveals that Kolkata鈥檚 luxury residential market (Rs 5鈥�10 crore) recorded a 33 per cent year-on-year rise in supply and a 52 per cent increase in sales in calendar year 2024 (CY24). South Kolkata led with 78 per cent of the segment鈥檚 supply. The average price rose by 6 per cent鈥攆rom Rs 17,519 to Rs 18,600 per sq ft鈥攚hile unsold inventory grew by 15 per cent. Monthly absorption improved from 2 to 3 units.In contrast, the ultra-luxury segment (Rs 10 crore and above) experienced a 17 per cent decline in supply and a 30 per cent fall in sales. Central Kolkata acco..

Next Story
Infrastructure Transport

New Expressway to Cut Pune-Bengaluru Travel Time by Half

The upcoming Pune-Bengaluru Expressway is expected to significantly improve connectivity and economic opportunities across Maharashtra and Karnataka. This 700-kilometre greenfield, access-controlled highway will cut the travel time between Pune and Bengaluru from 15 hours to just 7 hours, facilitating easier movement for both commuters and businesses. Starting from Bommanal in Karnataka鈥檚 Athani Taluk, the expressway will traverse important districts such as Belagavi, Bagalkot, and Jamakhandi. It will then enter Maharashtra at Kanjle, connect with the proposed Pune Ring Road, and pass throug..

Next Story
Infrastructure Transport

Nagpur鈥檚 Koradi Naka to Get Y-Shaped Flyover for Safer, Smoother Traffic

To alleviate traffic congestion and enhance safety at Koradi Naka in Nagpur, a Y-shaped flyover is currently being constructed on National Highway 47. Demolition work has already commenced, with the main construction scheduled to start on June 20, 2025.The project, costing Rs 430.37 billion, involves building a 1,090-meter-long flyover that will connect Farsa, the Mahadula Railway Overbridge (ROB), and Bokhara Road, and will also feature an underpass. The existing structure will be repurposed into a service road to facilitate local traffic.Koradi Naka has been identified as a significant "blac..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement