亚博体育官网首页

Centre flags Mumbai's first waste-to-energy plant
WATER & WASTE

Centre flags Mumbai's first waste-to-energy plant

The Ministry of Environment, Forest and Climate Change has granted Environment Clearance (EC) to Mumbai's first and upcoming Waste To Energy (WTE) plant at Deonar in the Govandi area. The BMC has now requested final approval from the Maharashtra Pollution Control Board (MPCB).

The BMC plans to construct the plant, which will have a capacity of 600 mt per day, on 12.19 hectares of land for Rs 504 crore, at the city's oldest dumping ground. The plant will generate 4 MW of electricity in addition to incineration of waste in the dumping ground. On December 7, the project received the required EC. Its copy, on the other hand, was recently uploaded to the BMC website.

The Deonar dumping ground, which was established in 1927, covers 120 hectares. Nearly 600 mt of the 7,000 mt of garbage generated daily in Mumbai is dumped in Deonar.

The Maharashtra State Environment Impact Assessment Authority (SEIAA) has approved BMC proposals subject to certain conditions, including the use of fly ash generated by the plant for brick manufacturing and road construction, air pollution control measures, and separate funds to implement the environment management plan.

It has also ordered BMC to establish an exclusive Environment Management Cell, as well as a groundwater level monitoring system and measures to prevent groundwater pollution.

The plant's construction will take about 40 months to complete. The BMC has also set aside Rs 12.40 crore for the implementation of mitigation measures under the environment management plan.

Locals and environmentalists opposed the project, citing concerns about pollution and health issues in the area caused by the plant. A public hearing for the project was held on April 27, 2021, as required by the 2006 Environment Impact Assessment Notification, which requires public consultation for draft impact assessments.

According to a report published in 2018 by the Centre for Science and Environment (CSE), the first such plant was established in Timarpur, Delhi, in 1987, but was quickly shut down.


Also read: Mumbai civic body seeks EC for 4 MW Deonar waste-to-energy plant

The Ministry of Environment, Forest and Climate Change has granted Environment Clearance (EC) to Mumbai's first and upcoming Waste To Energy (WTE) plant at Deonar in the Govandi area. The BMC has now requested final approval from the Maharashtra Pollution Control Board (MPCB). The BMC plans to construct the plant, which will have a capacity of 600 mt per day, on 12.19 hectares of land for Rs 504 crore, at the city's oldest dumping ground. The plant will generate 4 MW of electricity in addition to incineration of waste in the dumping ground. On December 7, the project received the required EC. Its copy, on the other hand, was recently uploaded to the BMC website. The Deonar dumping ground, which was established in 1927, covers 120 hectares. Nearly 600 mt of the 7,000 mt of garbage generated daily in Mumbai is dumped in Deonar. The Maharashtra State Environment Impact Assessment Authority (SEIAA) has approved BMC proposals subject to certain conditions, including the use of fly ash generated by the plant for brick manufacturing and road construction, air pollution control measures, and separate funds to implement the environment management plan. It has also ordered BMC to establish an exclusive Environment Management Cell, as well as a groundwater level monitoring system and measures to prevent groundwater pollution. The plant's construction will take about 40 months to complete. The BMC has also set aside Rs 12.40 crore for the implementation of mitigation measures under the environment management plan. Locals and environmentalists opposed the project, citing concerns about pollution and health issues in the area caused by the plant. A public hearing for the project was held on April 27, 2021, as required by the 2006 Environment Impact Assessment Notification, which requires public consultation for draft impact assessments. According to a report published in 2018 by the Centre for Science and Environment (CSE), the first such plant was established in Timarpur, Delhi, in 1987, but was quickly shut down. Image Source Also read: Mumbai civic body seeks EC for 4 MW Deonar waste-to-energy plant

Next Story
Real Estate

Kolkata鈥檚 luxury housing market sees price growth amid mixed trends

A new study by Nklusive reveals that Kolkata鈥檚 luxury residential market (Rs 5鈥�10 crore) recorded a 33 per cent year-on-year rise in supply and a 52 per cent increase in sales in calendar year 2024 (CY24). South Kolkata led with 78 per cent of the segment鈥檚 supply. The average price rose by 6 per cent鈥攆rom Rs 17,519 to Rs 18,600 per sq ft鈥攚hile unsold inventory grew by 15 per cent. Monthly absorption improved from 2 to 3 units.In contrast, the ultra-luxury segment (Rs 10 crore and above) experienced a 17 per cent decline in supply and a 30 per cent fall in sales. Central Kolkata acco..

Next Story
Infrastructure Transport

New Expressway to Cut Pune-Bengaluru Travel Time by Half

The upcoming Pune-Bengaluru Expressway is expected to significantly improve connectivity and economic opportunities across Maharashtra and Karnataka. This 700-kilometre greenfield, access-controlled highway will cut the travel time between Pune and Bengaluru from 15 hours to just 7 hours, facilitating easier movement for both commuters and businesses. Starting from Bommanal in Karnataka鈥檚 Athani Taluk, the expressway will traverse important districts such as Belagavi, Bagalkot, and Jamakhandi. It will then enter Maharashtra at Kanjle, connect with the proposed Pune Ring Road, and pass throug..

Next Story
Infrastructure Transport

Nagpur鈥檚 Koradi Naka to Get Y-Shaped Flyover for Safer, Smoother Traffic

To alleviate traffic congestion and enhance safety at Koradi Naka in Nagpur, a Y-shaped flyover is currently being constructed on National Highway 47. Demolition work has already commenced, with the main construction scheduled to start on June 20, 2025.The project, costing Rs 430.37 billion, involves building a 1,090-meter-long flyover that will connect Farsa, the Mahadula Railway Overbridge (ROB), and Bokhara Road, and will also feature an underpass. The existing structure will be repurposed into a service road to facilitate local traffic.Koradi Naka has been identified as a significant "blac..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement