Water level in India's main reservoirs rises to 26% : CWC
15 Jul 2024
2 Min Read
CW Team
Amid heavy rains in different parts of the country, water levels in 150 main reservoirs of the country have increased to 26 per cent of the total live storage capacity, still lower than in the same period last year, according to official data.
Last week, the water level was at 22 per cent. The current live storage stands at 46.311 billion cubic meters (BCM), which is 26 per cent of the total live storage capacity of these reservoirs. This is a significant drop compared to the same period last year, when the live storage was 58.864 BCM, according to Central Water Commission's (CWC's) Friday bulletin.
The reservoirs being monitored have a combined total live storage capacity of 178.784 BCM, representing 69.35 per cent of the overall estimated live storage capacity in the country.
Despite the extensive storage capacity, the current figures reveal that the available storage is only 79 per cent of last year's levels and 90 per cent of the normal storage, which is calculated based on the average storage over the past 10 years.
The northern region, encompassing Himachal Pradesh, Punjab, and Rajasthan, is experiencing a notable shortfall.
The 10 monitored reservoirs have a total live storage capacity of 19.663 BCM, with the current live storage at 5.979 BCM (30 per cent of capacity). This is significantly lower than last year's 63 per cent and the normal storage level of 35 per cent.
Amid heavy rains in different parts of the country, water levels in 150 main reservoirs of the country have increased to 26 per cent of the total live storage capacity, still lower than in the same period last year, according to official data.Last week, the water level was at 22 per cent. The current live storage stands at 46.311 billion cubic meters (BCM), which is 26 per cent of the total live storage capacity of these reservoirs. This is a significant drop compared to the same period last year, when the live storage was 58.864 BCM, according to Central Water Commission's (CWC's) Friday bulletin.The reservoirs being monitored have a combined total live storage capacity of 178.784 BCM, representing 69.35 per cent of the overall estimated live storage capacity in the country.Despite the extensive storage capacity, the current figures reveal that the available storage is only 79 per cent of last year's levels and 90 per cent of the normal storage, which is calculated based on the average storage over the past 10 years.The northern region, encompassing Himachal Pradesh, Punjab, and Rajasthan, is experiencing a notable shortfall.The 10 monitored reservoirs have a total live storage capacity of 19.663 BCM, with the current live storage at 5.979 BCM (30 per cent of capacity). This is significantly lower than last year's 63 per cent and the normal storage level of 35 per cent.
Next Story
Kolkata鈥檚 luxury housing market sees price growth amid mixed trends
A new study by Nklusive reveals that Kolkata鈥檚 luxury residential market (Rs 5鈥�10 crore) recorded a 33 per cent year-on-year rise in supply and a 52 per cent increase in sales in calendar year 2024 (CY24). South Kolkata led with 78 per cent of the segment鈥檚 supply. The average price rose by 6 per cent鈥攆rom Rs 17,519 to Rs 18,600 per sq ft鈥攚hile unsold inventory grew by 15 per cent. Monthly absorption improved from 2 to 3 units.In contrast, the ultra-luxury segment (Rs 10 crore and above) experienced a 17 per cent decline in supply and a 30 per cent fall in sales. Central Kolkata acco..
Next Story
New Expressway to Cut Pune-Bengaluru Travel Time by Half
The upcoming Pune-Bengaluru Expressway is expected to significantly improve connectivity and economic opportunities across Maharashtra and Karnataka. This 700-kilometre greenfield, access-controlled highway will cut the travel time between Pune and Bengaluru from 15 hours to just 7 hours, facilitating easier movement for both commuters and businesses. Starting from Bommanal in Karnataka鈥檚 Athani Taluk, the expressway will traverse important districts such as Belagavi, Bagalkot, and Jamakhandi. It will then enter Maharashtra at Kanjle, connect with the proposed Pune Ring Road, and pass throug..
Next Story
Nagpur鈥檚 Koradi Naka to Get Y-Shaped Flyover for Safer, Smoother Traffic
To alleviate traffic congestion and enhance safety at Koradi Naka in Nagpur, a Y-shaped flyover is currently being constructed on National Highway 47. Demolition work has already commenced, with the main construction scheduled to start on June 20, 2025.The project, costing Rs 430.37 billion, involves building a 1,090-meter-long flyover that will connect Farsa, the Mahadula Railway Overbridge (ROB), and Bokhara Road, and will also feature an underpass. The existing structure will be repurposed into a service road to facilitate local traffic.Koradi Naka has been identified as a significant "blac..