亚博体育官网首页

Nagpur civic body sought Rs 219 cr from MahaMetro for metro pillars
Real Estate

Nagpur civic body sought Rs 219 cr from MahaMetro for metro pillars

The Nagpur Municipal Corporation (NMC) seeks Rs 219.56 crore from MahaMetro for the land value on which the metro pillars were constructed of Aqua and Orange corridors of the Metro line.

The estate department of NMC calculated the land value according to the ready reckoner rates. According to a survey, MahaMetro has constructed the pillars on 32,512.5 sq m of land.

According to a senior official, NMC divided the land into four corridors: east, west, north and south. The pillars were constructed on 18,125 sq m of land on the east corridor, 10,687.5 sq m on the west corridor, 562.5 sq m on the north corridor and 3137.5 sq m on the south corridor.

According to the land value calculation, the civic body sought Rs 130 crore from the east corridor, Rs 64.6 crore from the west corridor, Rs 5.2 crore from the north and Rs 19.7 crore from the south corridor. It also sought Rs 859,21,08,510 as the land value for constructing buildings and stations at nine locations.

NMC and the National Institute of Technology (NIT) were to deposit Rs 434 crore each for the Rs 8,680 crore of the Phase-I of Nagpur Metro project.

NMC was to deposit Rs 73 crore in cash. It gave land for the metro project. It generated cash through transit-oriented development (TOD) and paid Rs 55 crore to MahaMetro.

The official said that NMC has already given land worth Rs 535 crore, which means it has paid extra to MahaMetro. It raised objections against the civic body for adjusting the land cost according to the ready reckoner rates.

The official said that MahaMetro had objected to the civic body's demand of levying land costs for erecting the Metro pillars.


Also read: Nagpur civic body asked to handover station road project to Maha Metro

The Nagpur Municipal Corporation (NMC) seeks Rs 219.56 crore from MahaMetro for the land value on which the metro pillars were constructed of Aqua and Orange corridors of the Metro line. The estate department of NMC calculated the land value according to the ready reckoner rates. According to a survey, MahaMetro has constructed the pillars on 32,512.5 sq m of land. According to a senior official, NMC divided the land into four corridors: east, west, north and south. The pillars were constructed on 18,125 sq m of land on the east corridor, 10,687.5 sq m on the west corridor, 562.5 sq m on the north corridor and 3137.5 sq m on the south corridor. According to the land value calculation, the civic body sought Rs 130 crore from the east corridor, Rs 64.6 crore from the west corridor, Rs 5.2 crore from the north and Rs 19.7 crore from the south corridor. It also sought Rs 859,21,08,510 as the land value for constructing buildings and stations at nine locations. NMC and the National Institute of Technology (NIT) were to deposit Rs 434 crore each for the Rs 8,680 crore of the Phase-I of Nagpur Metro project. NMC was to deposit Rs 73 crore in cash. It gave land for the metro project. It generated cash through transit-oriented development (TOD) and paid Rs 55 crore to MahaMetro. The official said that NMC has already given land worth Rs 535 crore, which means it has paid extra to MahaMetro. It raised objections against the civic body for adjusting the land cost according to the ready reckoner rates. The official said that MahaMetro had objected to the civic body's demand of levying land costs for erecting the Metro pillars. Image Source Also read: Nagpur civic body asked to handover station road project to Maha Metro

Next Story
Real Estate

Kolkata鈥檚 luxury housing market sees price growth amid mixed trends

A new study by Nklusive reveals that Kolkata鈥檚 luxury residential market (Rs 5鈥�10 crore) recorded a 33 per cent year-on-year rise in supply and a 52 per cent increase in sales in calendar year 2024 (CY24). South Kolkata led with 78 per cent of the segment鈥檚 supply. The average price rose by 6 per cent鈥攆rom Rs 17,519 to Rs 18,600 per sq ft鈥攚hile unsold inventory grew by 15 per cent. Monthly absorption improved from 2 to 3 units.In contrast, the ultra-luxury segment (Rs 10 crore and above) experienced a 17 per cent decline in supply and a 30 per cent fall in sales. Central Kolkata acco..

Next Story
Infrastructure Transport

New Expressway to Cut Pune-Bengaluru Travel Time by Half

The upcoming Pune-Bengaluru Expressway is expected to significantly improve connectivity and economic opportunities across Maharashtra and Karnataka. This 700-kilometre greenfield, access-controlled highway will cut the travel time between Pune and Bengaluru from 15 hours to just 7 hours, facilitating easier movement for both commuters and businesses. Starting from Bommanal in Karnataka鈥檚 Athani Taluk, the expressway will traverse important districts such as Belagavi, Bagalkot, and Jamakhandi. It will then enter Maharashtra at Kanjle, connect with the proposed Pune Ring Road, and pass throug..

Next Story
Infrastructure Transport

Nagpur鈥檚 Koradi Naka to Get Y-Shaped Flyover for Safer, Smoother Traffic

To alleviate traffic congestion and enhance safety at Koradi Naka in Nagpur, a Y-shaped flyover is currently being constructed on National Highway 47. Demolition work has already commenced, with the main construction scheduled to start on June 20, 2025.The project, costing Rs 430.37 billion, involves building a 1,090-meter-long flyover that will connect Farsa, the Mahadula Railway Overbridge (ROB), and Bokhara Road, and will also feature an underpass. The existing structure will be repurposed into a service road to facilitate local traffic.Koradi Naka has been identified as a significant "blac..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement