亚博体育官网首页

Indian Railways to operate 102 Vande Bharat trains by March 2024
RAILWAYS & METRO RAIL

Indian Railways to operate 102 Vande Bharat trains by March 2024

The Indian Railways is planning to make 102 Vande Bharat trains operational by March 2024.

Days after Prime Minister Narendra Modi declared the operation of 75 Vande Bharat trains, the Ministry of Railways has invited bids for producing 58 rakes, each including 16 coaches. Tenders have already been floated for building 44 rakes.

According to the Railway authorities, 102 Vande Bharat trains would be commissioned by early 2024. The Train18, later named Vande Bharat Express, was launched by the Integral Coach Factory, Chennai. It was showcased as India鈥檚 first semi high-speed train with the operational efficiency of 160 kmph and a game-changer.

On the occasion of the 75th Independence Day celebrations, Prime Minister Narendra Modi declared that 75 Vande Bharat trains would be operationalised to join different parts of the country.

In the fresh tenders, the Ministry of Railways insisted on the agreement of the Public Procurement (Preference to Make in India) Order 2017 and said that there was sufficient local capacity and competition in the supply of the tendered item in needed quantity and thus, public acquisition of this items is restrained to Class-I Local Suppliers only.

The new tender issued on Saturday invited bids for development, design, manufacture and supply of tools for three-phase propulsion and elements for train sets according to the Research Design and Standards Organisation specifications. Of the 58 rakes of 16 car composition, 30 would be launched from the ICF in Chennai, 14 from the Rail Coach Factory in Kapurthala and 14 from the Modern Coach Factory in Raebareli.

While contractors should certify the percentage of local elements and imported items, the tender conditions laid down that the eligibility for bidders from a country that shared land border with India to take part in the tender would be managed by the Public Procurement Orders of the Department of Expenditure, Ministry of Finance.


Also read: Indian Railways invites bids for 58 new Vande Bharat trains

The Indian Railways is planning to make 102 Vande Bharat trains operational by March 2024. Days after Prime Minister Narendra Modi declared the operation of 75 Vande Bharat trains, the Ministry of Railways has invited bids for producing 58 rakes, each including 16 coaches. Tenders have already been floated for building 44 rakes. According to the Railway authorities, 102 Vande Bharat trains would be commissioned by early 2024. The Train18, later named Vande Bharat Express, was launched by the Integral Coach Factory, Chennai. It was showcased as India鈥檚 first semi high-speed train with the operational efficiency of 160 kmph and a game-changer. On the occasion of the 75th Independence Day celebrations, Prime Minister Narendra Modi declared that 75 Vande Bharat trains would be operationalised to join different parts of the country. In the fresh tenders, the Ministry of Railways insisted on the agreement of the Public Procurement (Preference to Make in India) Order 2017 and said that there was sufficient local capacity and competition in the supply of the tendered item in needed quantity and thus, public acquisition of this items is restrained to Class-I Local Suppliers only. The new tender issued on Saturday invited bids for development, design, manufacture and supply of tools for three-phase propulsion and elements for train sets according to the Research Design and Standards Organisation specifications. Of the 58 rakes of 16 car composition, 30 would be launched from the ICF in Chennai, 14 from the Rail Coach Factory in Kapurthala and 14 from the Modern Coach Factory in Raebareli. While contractors should certify the percentage of local elements and imported items, the tender conditions laid down that the eligibility for bidders from a country that shared land border with India to take part in the tender would be managed by the Public Procurement Orders of the Department of Expenditure, Ministry of Finance. Image Source Also read: Indian Railways invites bids for 58 new Vande Bharat trains

Next Story
Real Estate

Kolkata鈥檚 luxury housing market sees price growth amid mixed trends

A new study by Nklusive reveals that Kolkata鈥檚 luxury residential market (Rs 5鈥�10 crore) recorded a 33 per cent year-on-year rise in supply and a 52 per cent increase in sales in calendar year 2024 (CY24). South Kolkata led with 78 per cent of the segment鈥檚 supply. The average price rose by 6 per cent鈥攆rom Rs 17,519 to Rs 18,600 per sq ft鈥攚hile unsold inventory grew by 15 per cent. Monthly absorption improved from 2 to 3 units.In contrast, the ultra-luxury segment (Rs 10 crore and above) experienced a 17 per cent decline in supply and a 30 per cent fall in sales. Central Kolkata acco..

Next Story
Infrastructure Transport

New Expressway to Cut Pune-Bengaluru Travel Time by Half

The upcoming Pune-Bengaluru Expressway is expected to significantly improve connectivity and economic opportunities across Maharashtra and Karnataka. This 700-kilometre greenfield, access-controlled highway will cut the travel time between Pune and Bengaluru from 15 hours to just 7 hours, facilitating easier movement for both commuters and businesses. Starting from Bommanal in Karnataka鈥檚 Athani Taluk, the expressway will traverse important districts such as Belagavi, Bagalkot, and Jamakhandi. It will then enter Maharashtra at Kanjle, connect with the proposed Pune Ring Road, and pass throug..

Next Story
Infrastructure Transport

Nagpur鈥檚 Koradi Naka to Get Y-Shaped Flyover for Safer, Smoother Traffic

To alleviate traffic congestion and enhance safety at Koradi Naka in Nagpur, a Y-shaped flyover is currently being constructed on National Highway 47. Demolition work has already commenced, with the main construction scheduled to start on June 20, 2025.The project, costing Rs 430.37 billion, involves building a 1,090-meter-long flyover that will connect Farsa, the Mahadula Railway Overbridge (ROB), and Bokhara Road, and will also feature an underpass. The existing structure will be repurposed into a service road to facilitate local traffic.Koradi Naka has been identified as a significant "blac..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement