亚博体育官网首页

Everest To Source 5.5 MWp Solar Power from Gentari
POWER & RENEWABLE ENERGY

Everest To Source 5.5 MWp Solar Power from Gentari

Everest Industries has announced its plan to procure 5.5 megawatt-peak (MWp) of solar power from Gentari (Amplus Solar) under a group captive model, strengthening its renewable energy commitment in Maharashtra.

As part of this initiative, the company will invest approximately Rs 17.6 million in Amplus Ampere, a special purpose vehicle (SPV) of Amplus Solar, by acquiring 1.76 million equity shares at a face value of Rs 10 each. The move is aimed at enabling captive open access for solar energy usage and enhancing Everest Industries' green energy footprint in the state.

In FY 2023鈥�24, the company consumed 152,023.4 gigajoules (GJ) of electricity from renewable sources, accounting for 44.88 per cent of its total power consumption of 338,719.14 GJ.

Everest Industries has already installed around 2,800 kilowatts (kW) of rooftop solar capacity across its facilities. Notable installations include:

A 700 kWp plant at Narmada Works in Gujarat, meeting 42 per cent of the unit鈥檚 energy demand.

A 1,100 kWp captive plant at Lakhmapur Works in Maharashtra, supplying 11 per cent of the facility鈥檚 power needs.

A 500 kWp captive plant commissioned at Somnathpur Works in Odisha in March 2024.

These efforts are part of the company鈥檚 broader strategy to reduce its carbon footprint and dependency on conventional energy, contributing to a more sustainable industrial future.

Image source:mercomindia


Everest Industries has announced its plan to procure 5.5 megawatt-peak (MWp) of solar power from Gentari (Amplus Solar) under a group captive model, strengthening its renewable energy commitment in Maharashtra.As part of this initiative, the company will invest approximately Rs 17.6 million in Amplus Ampere, a special purpose vehicle (SPV) of Amplus Solar, by acquiring 1.76 million equity shares at a face value of Rs 10 each. The move is aimed at enabling captive open access for solar energy usage and enhancing Everest Industries' green energy footprint in the state.In FY 2023鈥�24, the company consumed 152,023.4 gigajoules (GJ) of electricity from renewable sources, accounting for 44.88 per cent of its total power consumption of 338,719.14 GJ.Everest Industries has already installed around 2,800 kilowatts (kW) of rooftop solar capacity across its facilities. Notable installations include:A 700 kWp plant at Narmada Works in Gujarat, meeting 42 per cent of the unit鈥檚 energy demand.A 1,100 kWp captive plant at Lakhmapur Works in Maharashtra, supplying 11 per cent of the facility鈥檚 power needs.A 500 kWp captive plant commissioned at Somnathpur Works in Odisha in March 2024.These efforts are part of the company鈥檚 broader strategy to reduce its carbon footprint and dependency on conventional energy, contributing to a more sustainable industrial future.Image source:mercomindia

Next Story
Infrastructure Transport

300 Km Viaduct Complete on Mumbai-Ahmedabad Bullet Train

Union Minister Ashwini Vaishnaw on Tuesday shared a major progress update on India鈥檚 ambitious Mumbai鈥揂hmedabad Bullet Train project. Posting a video on his official X handle, the Railway Minister announced that 300 kilometres of viaduct construction have been completed.The National High-Speed Rail Corporation Limited (NHSRCL), which is overseeing the project, also reported that approximately 76 per cent of excavation work for the Mumbai bullet train station at Bandra Kurla Complex (BKC) has been completed. Notably, it will be the only underground station on the high-speed corridor.Three b..

Next Story
Infrastructure Transport

Centre Approves Rajpura鈥揅handigarh Rail Line Project

The long-awaited railway link from Rajpura in Punjab to Chandigarh is set to become a reality, with the central government approving the project and allocating Rs 2.03 billion for its execution. Union Railway Minister Ravneet Singh Bittu confirmed the development, stating that the 24-kilometre line will be fully funded by the Centre and is targeted for completion within two years.The new rail line will enhance connectivity for the Malwa region, linking it directly to the state capital. Unlike previous rail projects that required cost-sharing between the Centre and the state, this initiative wi..

Next Story
Infrastructure Transport

PM to Inaugurate 5 Redeveloped Stations in Vadodara Division

Prime Minister Narendra Modi will virtually inaugurate five newly redeveloped railway stations in Gujarat鈥檚 Vadodara division on 22 May. The stations鈥擠akor, Karamsad, Derol, Kosamba, and Utran鈥攈ave been modernised under the Amrit Bharat Station Scheme (ABSS), aimed at transforming over 1,300 stations into world-class transit hubs.The ABSS initiative, launched two years ago, focuses on improving passenger amenities, accessibility, and aesthetics by incorporating sustainable infrastructure and local cultural elements.Each of the five stations reflects regional character while enhancing fun..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement