亚博体育官网首页

Arunachal Pradesh sees 65% growth in highway construction in 8 years
ROADS & HIGHWAYS

Arunachal Pradesh sees 65% growth in highway construction in 8 years

According to the Arunachal Pradesh government, national and state highway construction increased by 65 per cent in the border state of Arunachal Pradesh between 2015鈥�16 and 2022鈥�23. According to information provided by the company, road building expanded from 30,692 km in 2015鈥�16 to 50,555 km in 2022鈥�23, of which 2,506 km are border roads.

The 1,863 km overall length of Arunachal's international border includes 217 km with Bhutan, 520 km with Myanmar, and 1,126 km with China. Pema Khandu, Chief Minister of Arunachal Pradesh said in an interview with Economic Times that at present, Arunachal has the highest funds spent on roads and bridges in the entire country. About 12.7 per cent of the state budget has been allocated for roads and bridge construction.

3,488 km of the Ladakh, Arunachal, Himachal Pradesh, Uttarakhand, and Sikkim border are shared by India and China. The third phase of the Indo-China Border Roads (ICBR-III), for which new projects have been identified, will begin construction once the 2020 standoff with the Chinese PLA is over, according to the Centre, state authorities, and Border Roads Organisation (BRO). Although the first two phases were planned for the early 2000s, they noted, other projects were still in progress.

India has constructed 'formation cutting', which entails new alignments and earthworks, at a rate of 470 km of highways every year between 2017 and 20; this is double the 230 km a year maintained in the ten years prior to 2017. In accordance with the India-China Border Roads (ICBR) strategy, 73 roads were designated as strategic Indo-China Border Roads (ICBRs), 61 of which were given to BRO. Of these projects, 29 have been finished, while work on the other 32 is still ongoing.

Recently, Union home minister Amit Shah launched Vibrant Village Programme (VVP) in Arunachal Pradesh and said he "will be monitoring the development work regularly". The Union government has allocated Rs 48 billion, including Rs 25 billion exclusively for road connectivity, for 2022-23 to 2025-26.

Also Read
4 laning of bypass to NH114A connecting NH333 and NH133, NHAI
Government plans to build 45 km of roads each day in FY24


According to the Arunachal Pradesh government, national and state highway construction increased by 65 per cent in the border state of Arunachal Pradesh between 2015鈥�16 and 2022鈥�23. According to information provided by the company, road building expanded from 30,692 km in 2015鈥�16 to 50,555 km in 2022鈥�23, of which 2,506 km are border roads. The 1,863 km overall length of Arunachal's international border includes 217 km with Bhutan, 520 km with Myanmar, and 1,126 km with China. Pema Khandu, Chief Minister of Arunachal Pradesh said in an interview with Economic Times that at present, Arunachal has the highest funds spent on roads and bridges in the entire country. About 12.7 per cent of the state budget has been allocated for roads and bridge construction. 3,488 km of the Ladakh, Arunachal, Himachal Pradesh, Uttarakhand, and Sikkim border are shared by India and China. The third phase of the Indo-China Border Roads (ICBR-III), for which new projects have been identified, will begin construction once the 2020 standoff with the Chinese PLA is over, according to the Centre, state authorities, and Border Roads Organisation (BRO). Although the first two phases were planned for the early 2000s, they noted, other projects were still in progress. India has constructed 'formation cutting', which entails new alignments and earthworks, at a rate of 470 km of highways every year between 2017 and 20; this is double the 230 km a year maintained in the ten years prior to 2017. In accordance with the India-China Border Roads (ICBR) strategy, 73 roads were designated as strategic Indo-China Border Roads (ICBRs), 61 of which were given to BRO. Of these projects, 29 have been finished, while work on the other 32 is still ongoing. Recently, Union home minister Amit Shah launched Vibrant Village Programme (VVP) in Arunachal Pradesh and said he will be monitoring the development work regularly. The Union government has allocated Rs 48 billion, including Rs 25 billion exclusively for road connectivity, for 2022-23 to 2025-26. Also Read 4 laning of bypass to NH114A connecting NH333 and NH133, NHAIGovernment plans to build 45 km of roads each day in FY24

Next Story
Real Estate

Kolkata鈥檚 luxury housing market sees price growth amid mixed trends

A new study by Nklusive reveals that Kolkata鈥檚 luxury residential market (Rs 5鈥�10 crore) recorded a 33 per cent year-on-year rise in supply and a 52 per cent increase in sales in calendar year 2024 (CY24). South Kolkata led with 78 per cent of the segment鈥檚 supply. The average price rose by 6 per cent鈥攆rom Rs 17,519 to Rs 18,600 per sq ft鈥攚hile unsold inventory grew by 15 per cent. Monthly absorption improved from 2 to 3 units.In contrast, the ultra-luxury segment (Rs 10 crore and above) experienced a 17 per cent decline in supply and a 30 per cent fall in sales. Central Kolkata acco..

Next Story
Infrastructure Transport

New Expressway to Cut Pune-Bengaluru Travel Time by Half

The upcoming Pune-Bengaluru Expressway is expected to significantly improve connectivity and economic opportunities across Maharashtra and Karnataka. This 700-kilometre greenfield, access-controlled highway will cut the travel time between Pune and Bengaluru from 15 hours to just 7 hours, facilitating easier movement for both commuters and businesses. Starting from Bommanal in Karnataka鈥檚 Athani Taluk, the expressway will traverse important districts such as Belagavi, Bagalkot, and Jamakhandi. It will then enter Maharashtra at Kanjle, connect with the proposed Pune Ring Road, and pass throug..

Next Story
Infrastructure Transport

Nagpur鈥檚 Koradi Naka to Get Y-Shaped Flyover for Safer, Smoother Traffic

To alleviate traffic congestion and enhance safety at Koradi Naka in Nagpur, a Y-shaped flyover is currently being constructed on National Highway 47. Demolition work has already commenced, with the main construction scheduled to start on June 20, 2025.The project, costing Rs 430.37 billion, involves building a 1,090-meter-long flyover that will connect Farsa, the Mahadula Railway Overbridge (ROB), and Bokhara Road, and will also feature an underpass. The existing structure will be repurposed into a service road to facilitate local traffic.Koradi Naka has been identified as a significant "blac..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement